Course modules
18 modules over 10 daysParticipants can explain when a road PPP is an appropriate delivery route.
- PPP definitions, concession structures and lifecycle responsibilities in road delivery
- Road asset classes: new build, rehabilitation, bridges and maintenance corridors
- Comparing conventional procurement, design-build and long-term PPP arrangements
- Public authority, sponsor, lender and contractor roles mapped clearly
- Service outputs versus construction inputs in performance-based road contracts
- PPP project cycle from identification through handback and expiry
Participants can map the approvals, mandates and governance needed for a PPP transaction.
- PPP policy objectives linked to transport plans and fiscal rules
- Institutional mandates for ministries, road agencies, PPP units and regulators
- Stage-gate approvals from project concept to financial close
- Cabinet, treasury and legislative decisions affecting concession commitments
- Governance map separating decision rights, advice and assurance functions
- Disclosure requirements for contracts, fiscal commitments and procurement decisions
Participants can screen candidate road projects against practical PPP suitability criteria.
- Defining corridor problems using travel time, safety and reliability evidence
- Initial demand assessment from origin-destination surveys and traffic counts
- Screening criteria for scale, service measurability and lifecycle requirements
- Market sounding questions for contractors, operators, lenders and investors
- Fatal-flaw analysis covering land, permits, utilities and political support
- PPP suitability scorecard documented with evidence and decision rationale
Participants can define output specifications and technical interfaces for a road concession.
- Output specifications for pavement condition, availability and roadside safety
- Level-of-service indicators for lanes, bridges, drainage and incident response
- Baseline surveys establishing asset condition before rehabilitation concessions
- Interface matrix for utilities, adjacent works and third-party access
- Lifecycle maintenance plans aligned with pavement and structure deterioration
- Handback requirements supported by inspections, reserves and condition standards
Participants can assess traffic assumptions and select an appropriate demand-risk approach.
- Traffic forecasting inputs: counts, stated preference, growth and route choice
- Base, downside and upside cases tested through sensitivity analysis
- Willingness-to-pay evidence for tolled roads and managed lanes
- Revenue leakage controls covering toll evasion, exemptions and collections
- Demand-risk allocation between authority, concessionaire and road users
- Shadow tolls, minimum revenue guarantees and revenue-sharing arrangements
Participants can prepare an economic case that supports a road PPP decision.
- Cost-benefit analysis using travel time, vehicle operating and safety benefits
- Economic internal rate of return and net present value calculations
- Discount rates, appraisal periods and residual values documented transparently
- Distributional effects assessed for users, non-users and affected communities
- Environmental and social costs incorporated into economic appraisal assumptions
- Strategic case narrative connecting corridor investment to policy outcomes
Participants can compare PPP and public-delivery options using value for money analysis.
- Public Sector Comparator built from capital, operating and risk costs
- Value for money drivers: lifecycle efficiency, risk transfer and competition
- Discounted cash flow comparison of PPP and public procurement options
- Optimism bias and reference class forecasting applied to cost estimates
- Qualitative value for money factors documented alongside model results
- Affordability, value for money and bankability distinguished in approvals
Participants can create a road PPP risk matrix with justified allocation proposals.
- Risk breakdown structure covering development, construction, operations and finance
- Probability-impact scoring calibrated through a risk assessment matrix
- Allocating risks to the party best able to manage
- Geotechnical, right-of-way and utility risks treated through evidence-led provisions
- Force majeure, political force majeure and change-in-law provisions
- Risk register linking mitigations, owners, costs and contractual remedies
Participants can interpret the core cash flows and outputs of a PPP financial model.
- Model architecture linking construction, operations, financing and investor returns
- Sources-and-uses schedule covering equity, debt, grants and reserves
- Cash flow waterfall from revenue through operating costs and debt service
- Debt service coverage ratio and loan life coverage ratio
- Equity internal rate of return and sponsor cash distributions
- Sensitivity tables for costs, traffic, interest rates and delays
Participants can assess financing terms and lender requirements for a road PPP.
- Senior debt, subordinated debt and equity roles within project finance
- Term sheets covering tenor, margins, covenants and repayment profiles
- Construction completion tests required before long-term debt conversion
- Direct agreements protecting lenders during concessionaire default events
- Security package over project accounts, contracts and concession rights
- Multilateral guarantees, viability gap funding and credit enhancement options
Participants can design a payment mechanism aligned with road service outcomes and budget limits.
- Availability payments calculated from unitary charges and performance deductions
- Indexation formulas separating inflation, foreign exchange and input-price movements
- Toll tariff structures, escalation rules and collection responsibilities
- Performance deductions for closures, poor pavement and safety failures
- Affordability model projecting annual payments against medium-term budget ceilings
- Fiscal commitments and contingent liabilities recorded in government reporting
Participants can incorporate environmental, social and stakeholder obligations into PPP preparation.
- Environmental and social impact assessment requirements before procurement launch
- Land acquisition and resettlement responsibilities allocated between project parties
- Stakeholder mapping for communities, freight operators and local governments
- Grievance mechanisms with escalation routes, records and response periods
- Biodiversity, drainage and climate resilience measures specified contractually
- Gender and accessibility requirements embedded within road service standards
Participants can plan a competitive procurement process for a bankable road concession.
- Procurement route selection: open tender, prequalification or competitive dialogue
- Request for qualification criteria testing technical, financial and legal capacity
- Market sounding protocol protecting fairness, confidentiality and procurement integrity
- Data room contents including surveys, designs, permits and traffic information
- Bid timetable aligned with approvals, lender diligence and bidder questions
- Probity controls for conflicts, communications and evaluation records
Participants can evaluate road PPP bids using transparent and defensible criteria.
- Evaluation plan defining pass-fail, scored and financial assessment criteria
- Technical scoring of design, maintenance methodology and mobilisation proposals
- Financial bid comparison using net present cost and affordability tests
- Assessing bidder financial capacity, funding evidence and key personnel
- Clarification protocols that preserve equal treatment among bidders
- Preferred bidder report documenting scores, risks and recommendation rationale
Participants can identify the contractual provisions and management controls needed after award.
- Concession agreement structure: scope, term, payment, risks and termination
- Key performance indicators monitored through inspection and reporting protocols
- Independent engineer roles during construction certification and dispute review
- Change-control process for variations, compensation events and refinancings
- Dispute resolution ladder using negotiation, expert determination and arbitration
- Contract management plan assigning authority roles, meetings and escalation
Participants can monitor delivery performance throughout construction, operations and handback.
- Construction monitoring against milestones, quality plans and completion tests
- Independent technical adviser reports reviewed by authority and lenders
- Operations dashboards tracking availability, pavement condition and incident response
- Payment certification process linking verified performance to monthly invoices
- Early-warning indicators for financial distress and contract non-performance
- Handback inspections, reserve accounts and asset-condition verification procedures
Participants can manage material changes and distress events while protecting public value.
- Renegotiation triggers distinguished from routine contract administration matters
- Refinancing gain-sharing clauses and approval requirements for debt changes
- Financial distress indicators: covenant breach, arrears and delayed works
- Step-in rights for lenders and public authorities during default
- Termination payment calculations under authority default, concessionaire default and force majeure
- Lessons-learned review capturing causes, decisions and corrective actions
Participants can build, review and present a complete outline road PPP business case and procurement recommendation.
- Project concept note defining corridor need, scope and service outcomes
- Demand, technical and environmental assumptions consolidated into an evidence base
- Economic case, Public Sector Comparator and affordability findings presented
- Risk matrix and proposed allocation tested against market capability
- Payment mechanism, financing structure and procurement timetable integrated
- Peer review challenging bankability, value for money and implementation readiness
- Executive presentation defending the recommended road PPP delivery structure
Exercises and examples are adapted to each cohort's sectors and roles.