Course modules
20 modules over 10 daysParticipants can map the supply chain interfaces supporting an oil and gas operation.
- Upstream, midstream, downstream and LNG supply chain operating characteristics
- Asset lifecycle demand from exploration through abandonment and decommissioning
- Material, service and equipment flows supporting producing asset availability
- Maintenance, operations, projects and procurement decision-rights mapped using RACI
- Production loss consequences linked to materials availability and response time
- Supply chain maturity assessment against asset reliability and cost objectives
Participants can segment supply requirements according to operational consequence and supply risk.
- Criticality rankings derived from safety, production, environmental and repair consequences
- ABC analysis combined with XYZ demand variability classification
- Kraljic Portfolio Matrix for strategic, bottleneck, leverage and routine categories
- Service requirements translated into availability, response and delivery measures
- Demand segmentation separating planned maintenance, breakdowns and project requirements
- Risk heat maps linking item criticality with supply vulnerability
Participants can build demand plans from maintenance, production and project inputs.
- Maintenance plans converted into time-phased material demand forecasts
- Bill of materials validation before planned shutdown and turnaround work
- Project procurement schedules aligned with engineering release and construction milestones
- Thirteen-week rolling demand plan for operating materials and services
- Forecast accuracy measured through bias, mean absolute deviation and variance
- Demand review cadence connecting planners, maintenance, warehouses and buyers
Participants can prepare procurement data that supports accurate technical and commercial evaluation.
- Material master data fields for description, manufacturer, model and unit
- Technical specifications distinguishing mandatory requirements from preferred features
- Datasheets, drawings and inspection requirements included within requisition packages
- Approved manufacturer lists controlled against engineering and quality requirements
- Duplicate material records identified through attribute matching and standardisation
- Change control for specifications, substitutions and engineering deviations
Participants can create category strategies for high-value and operationally critical spend.
- Spend analysis by category, supplier, asset, location and demand type
- Supply market analysis covering capacity, competition, barriers and price drivers
- Kraljic positioning used to select category-specific sourcing approaches
- Category strategy charter defining scope, objectives, stakeholders and governance
- Make-buy analysis for maintenance services and specialist equipment support
- Should-cost inputs identified from labour, materials, overheads and logistics
Participants can compare sourcing options using total cost and commercial risk measures.
- Total cost of ownership includes acquisition, transport, holding and disposal
- Lifecycle cost comparisons for pumps, valves, rotating equipment and consumables
- Incoterms 2020 allocation of costs, risks and transport responsibilities
- Currency exposure assessed through quotation validity and payment terms
- Price adjustment formulas linked to indices, labour rates and commodities
- Commercial evaluation models weighted for price, delivery, quality and risk
Participants can manage a disciplined sourcing process from strategy through award recommendation.
- Sourcing plans define competition, timetable, evaluation and approval routes
- Request for quotation packages specify scope, terms and bid instructions
- Prequalification criteria assess capability, financial health, safety and quality
- Technical bid evaluation separates compliance review from commercial comparison
- Clarification registers maintain equal treatment and auditable bidder communications
- Award recommendations document value, risks, approvals and negotiation outcomes
Participants can select contract structures and controls suited to oil and gas requirements.
- Purchase orders, framework agreements and call-off mechanisms compared
- Service scopes define deliverables, mobilisation, personnel and equipment responsibilities
- Key performance indicators embedded within service level agreements
- Liquidated damages, warranties and remedies aligned with commercial exposure
- Variation control records scope changes, rates, approvals and schedule effects
- Contract administration calendars track milestones, notices, renewals and claims
Participants can establish supplier qualification and quality controls for purchased goods and services.
- Supplier due diligence covers legal status, ownership, sanctions and financial stability
- ISO 9001 quality management evidence reviewed during supplier qualification
- API Spec Q1 requirements considered for oilfield manufacturing suppliers
- Quality plans define hold points, witness points and inspection responsibilities
- Material certificates checked for grade, heat number and traceability
- Nonconformance reports managed through containment, root cause and corrective action
Participants can manage supplier performance through scorecards, reviews and improvement actions.
- Supplier scorecards measure quality, delivery, safety, responsiveness and cost
- On-time in-full performance calculated from confirmed delivery commitments
- Quarterly business reviews focus on trends, actions and accountable owners
- Supplier development plans target recurring quality failures and delivery constraints
- Escalation pathways distinguish routine issues from operationally critical failures
- Performance data supports renewal, corrective action or supplier exit decisions
Participants can set inventory policies that protect availability without unnecessary stock investment.
- Critical spares analysis considers consequence, lead time and failure probability
- Min-max settings calculated from demand, lead time and safety stock
- Reorder point formulas incorporate average demand and lead-time variability
- Economic order quantity assumptions tested against storage and obsolescence costs
- Insurance spares distinguished from operating stock and project materials
- Stockout investigations identify planning, master data and supplier root causes
Participants can design warehouse controls for accurate, safe and traceable materials handling.
- Goods receipt verifies quantity, documentation, condition and purchase order conformity
- Quarantine procedures separate accepted, rejected, damaged and suspect materials
- Bin location systems support retrieval, cycle counting and stock visibility
- FIFO and FEFO rules applied to shelf-life controlled inventory
- Cycle count plans prioritise high-value, critical and error-prone stock
- Preservation routines protect valves, bearings, cables and rotating equipment
Participants can maintain traceability records required for controlled oil and gas materials.
- Heat number traceability maintained from receiving through issue and installation
- Material test reports matched against purchase requirements and markings
- Certificate of conformity review confirms specified standards and batch details
- Controlled material substitutions authorised through engineering deviation procedures
- Hazardous materials registers record safety data sheets and storage controls
- Document retention schedules support audit, warranty and incident investigation
Participants can plan logistics flows for offshore, remote and time-critical operations.
- Transport mode selection balances urgency, cost, capacity and cargo constraints
- Incoterms 2020 responsibilities verified before freight booking and insurance placement
- Customs documentation includes commercial invoices, packing lists and origin certificates
- Dangerous goods shipments follow classification, packaging, marking and declaration requirements
- Offshore supply base planning coordinates manifests, backloads and vessel windows
- Expediting plans identify critical milestones from manufacture through final delivery
Participants can assess supply disruption risks and define proportionate continuity controls.
- Supply risk registers record cause, consequence, owner, control and status
- Single-source exposure assessed through alternatives, qualification time and switching costs
- Business continuity plans define inventory buffers, alternate routes and suppliers
- Geopolitical, sanctions and trade restrictions screened before supplier commitment
- Scenario planning tests responses to plant shutdowns and transport disruption
- Risk treatment priorities selected using probability, impact and detectability scores
Participants can coordinate materials and services for turnaround and shutdown execution.
- Turnaround work packs linked to materials lists and service scopes
- Long-lead items identified through procurement lead-time and criticality analysis
- Readiness reviews confirm material status, certificates, storage and preservation
- Kitting plans assemble work-order materials before shutdown mobilisation
- Expediting dashboards track fabrication, inspection, shipment and site receipt
- Post-turnaround reconciliation resolves surplus, returns, defects and stock updates
Participants can align procurement activities with engineering, construction and commissioning plans.
- Procurement schedules link engineering deliverables with purchase order placement
- Long-lead equipment registers track design, manufacture, inspection and shipment
- Vendor data requirements support construction, commissioning and asset handover
- Expediting reports identify schedule threats, recovery actions and accountable parties
- Interface matrices clarify responsibilities between EPC contractors and owner teams
- Preservation and handover requirements protect equipment before commissioning
Participants can define practical performance measures and data controls for supply chain decisions.
- SCOR metrics connect reliability, responsiveness, cost, assets and agility
- Perfect order measures combine completeness, accuracy, timeliness and condition
- Inventory turnover interpreted alongside criticality, service level and obsolescence
- Purchase order cycle time measured from approved requisition to delivery
- Master data governance assigns ownership for supplier, item and contract records
- Dashboard design distinguishes operational alerts from management performance trends
Participants can govern supply chain decisions with clear stakeholder roles and escalation routes.
- Stakeholder maps identify decision-makers, technical authorities, users and approvers
- RACI matrices clarify accountability for requisition, evaluation, award and receipt
- Procurement authority limits matched to spend, risk and contract duration
- Exception approvals document urgency, sole source rationale and compensating controls
- Supply meetings use action logs, decision records and escalation thresholds
- Ethical procurement controls address conflicts, gifts, confidentiality and competition
Participants can build, review and present a complete supply chain plan for an oil and gas asset or project.
- Asset demand profile translated into category, inventory and logistics requirements
- Criticality and risk analysis prioritise controls for operationally significant requirements
- Category strategies specify sourcing routes, supplier controls and commercial approach
- Inventory policy defines service levels, replenishment parameters and preservation controls
- Performance dashboard combines delivery, availability, quality, cost and risk measures
- Peer review tests assumptions, governance, contingencies and implementation priorities
Exercises and examples are adapted to each cohort's sectors and roles.








