Course modules
21 modules over 10 daysParticipants can define the operating model, control boundaries and performance requirements for a multi-shift area.
- 24-hour operating model linking customer demand, assets, staffing and constraints
- Shift-system types: fixed, rotating, continental, DuPont and compressed schedules
- Operational boundaries between production, maintenance, logistics, quality and support teams
- Service-level requirements converted into shift-level output and response expectations
- Critical control points identified across startup, steady-state, changeover and shutdown
- Accountability map using RACI for cross-shift operating decisions
Participants can translate demand patterns into capacity, workload and crew coverage requirements.
- Demand profiles translated into hourly workload, crew requirements and bottlenecks
- Takt time, cycle time and throughput compared for capacity planning
- Capacity cushion set against demand volatility, downtime and staffing uncertainty
- Bottleneck analysis identifies constraints limiting sustained multi-shift output
- Queueing effects examined where variable arrivals create service backlogs
- Workload forecast distinguishes planned volume, emergency work and rework
Participants can design defensible shift patterns that balance coverage, fatigue and cost.
- Roster design balances coverage, rest periods, skills, preferences and statutory limits
- Forward and backward rotation compared using fatigue and recovery criteria
- Shift length assessed against task demands, travel time and night work
- Coverage models account for holidays, sickness, training and planned absences
- Overtime rules incorporated into rota design and labour-cost forecasting
- Roster scenarios tested against peak demand, breakdowns and seasonal variation
Participants can calculate staffing needs and protect critical skills on every shift.
- Crew-size calculation uses workload standards, productive hours and relief factors
- Skill matrix identifies mandatory competencies, authorisations and single-point dependencies
- Relief-factor calculation accounts for leave, sickness, training and absenteeism
- Minimum safe staffing defined for normal, degraded and emergency conditions
- Cross-training priorities selected from risk, demand and succession evidence
- Agency and contractor deployment controlled through role, induction and supervision requirements
Participants can establish reliable handovers that preserve operational control between crews.
- Standard handover checklist covers status, risks, work permits and exceptions
- SBAR structure improves concise communication of critical operational information
- Logbook standards distinguish facts, actions, ownership and completion evidence
- Face-to-face overlap planned for high-risk transitions and complex process changes
- Escalation triggers define when outgoing crews retain responsibility for unresolved issues
- Digital handover records controlled through timestamps, approvals and audit trails
Participants can standardise recurring work while allowing controlled responses to variation.
- Standard work documents sequence, timing, quality points and safety controls
- Leader standard work sets daily checks, coaching routines and escalation duties
- Job breakdown sheets capture key steps, reasons and critical precautions
- Standard operating procedures governed through version control and document ownership
- Abnormal-condition response cards guide immediate containment and escalation actions
- Change-control process updates standard work after approved operating changes
Participants can run visual daily management routines that connect shifts to management decisions.
- SQDCP board tracks safety, quality, delivery, cost and people measures
- Tiered meetings connect frontline issues with departmental and site-level decisions
- Plan-versus-actual charts expose hourly deviation from operational targets
- Andon escalation rules specify response time, ownership and closure evidence
- Daily accountability board records actions, due dates and blocking issues
- Shift-start meetings align priorities, hazards, staffing changes and planned work
Participants can select and interpret measures that reveal shift-level performance losses.
- KPI hierarchy links shift measures to site targets and customer commitments
- Leading indicators track conditions preceding safety, quality and delivery failures
- Lagging indicators used carefully for trend analysis and performance review
- Control charts distinguish common-cause variation from special-cause operational signals
- Shift comparison avoids misleading conclusions from unequal demand and product mix
- Data-definition sheets standardise metric formulas, sources, owners and reporting frequency
Participants can quantify equipment losses and prioritise improvement actions using OEE.
- Overall Equipment Effectiveness combines availability, performance and quality loss measures
- Six big losses classify breakdowns, setup, idling, speed and defect losses
- Loss-tree analysis separates chronic losses from isolated major events
- Pareto charts rank downtime causes by duration, frequency and production impact
- SMED analysis separates internal and external changeover activities
- Micro-stoppage data captured through operator logs and machine event records
Participants can maintain consistent quality controls, release decisions and defect learning across shifts.
- Control plans define checks, frequencies, specifications and reaction plans
- First-off approval confirms setup quality before sustained production begins
- Statistical process control monitors variation at defined process control points
- Nonconformance containment protects customers while root causes are investigated
- Shift-to-shift defect analysis identifies recurring conditions and ownership gaps
- Layered process audits verify critical controls during all operating hours
Participants can coordinate operations and maintenance to improve asset reliability across shifts.
- Planned maintenance windows aligned with demand, shutdowns and operating constraints
- Maintenance backlog prioritised by safety, production risk and asset criticality
- Permit-to-work coordination protects simultaneous operations and maintenance activities
- Operator care routines cover inspection, cleaning, lubrication and minor adjustment
- Failure reporting captures symptoms, conditions, response and recurrence details
- Reliability-centred maintenance principles guide task selection for critical assets
Participants can control material availability, inventory accuracy and changeovers across all shifts.
- Kanban replenishment signals match consumption rates, lead times and buffer stock
- Point-of-use inventory controls prevent shortages, excess stock and searching time
- Cycle counting routines maintain inventory accuracy across overnight operations
- Material shortages escalated through defined substitution, allocation and expediting rules
- Changeover checklist coordinates materials, tooling, specifications and quality release
- FIFO controls protect shelf-life, traceability and stock rotation requirements
Participants can apply fatigue and safety controls appropriate to night work and extended shifts.
- Fatigue-risk assessment considers shift timing, duration, workload and recovery
- ISO 45001 principles applied to operational hazard reporting and control
- Night-shift risk controls address reduced supervision, visibility and emergency response
- Fit-for-work checks identify fatigue, impairment and capability concerns
- Critical-task scheduling avoids high-risk work during predictable fatigue periods
- Near-miss reporting encourages early intervention before serious operational events
Participants can introduce shift changes through structured consultation, communication and transition planning.
- Schedule-change business case quantifies service, cost, safety and workforce effects
- Stakeholder mapping identifies employees, unions, managers and affected support functions
- Consultation plan sets information, feedback, decision and communication stages
- Roster pilots test operational assumptions before permanent schedule implementation
- Transition plans manage training, payroll changes, transport and childcare impacts
- Post-implementation review measures acceptance, attendance, performance and unintended consequences
Participants can manage operational incidents through clear command, communication and recovery routines.
- Incident classification distinguishes routine deviations from major operational emergencies
- Escalation matrix assigns authority, notification paths and decision thresholds
- First-response checklist prioritises people, containment, continuity and evidence preservation
- Situation reports communicate status, impacts, decisions and resource needs
- Business continuity procedures maintain critical service during workforce or asset disruption
- Recovery planning sequences restart checks, quality verification and stakeholder updates
Participants can investigate recurring operational problems and control corrective actions to closure.
- A3 problem solving frames background, condition, analysis, countermeasures and follow-up
- 5 Whys probes causal chains without assigning premature individual blame
- Fishbone diagrams organise potential causes across people, methods, machines and materials
- Fault tree analysis examines combinations of failures causing critical events
- Corrective-action register assigns owners, dates, verification and effectiveness checks
- PDCA cycles test countermeasures before standardising successful operating changes
Participants can lead consistent performance, accountability and communication across separated crews.
- Shift-leader routines balance production control, coaching, safety and escalation
- Gemba walks examine actual work, conditions, barriers and standard adherence
- Briefing techniques communicate priorities without overloading crews with information
- Feedback conversations address performance gaps using observable facts and agreed actions
- Recognition practices reinforce reporting, teamwork, improvement and safe decisions
- Cross-shift conflict resolved through shared facts, operating standards and escalation
Participants can build an improvement pipeline from operational losses, employee ideas and strategic priorities.
- Kaizen funnel captures improvement ideas from every crew and support function
- Impact-effort matrix prioritises opportunities using value, risk and implementation difficulty
- Value stream mapping identifies waiting, rework, transport and handoff delays
- Benefit tracking separates validated savings from estimated operational improvements
- Improvement charters define problem, scope, measures, sponsors and expected benefits
- Standardisation plan embeds approved improvements into training, procedures and audits
Participants can set practical data governance and reporting controls for multi-shift decision making.
- Shift data architecture defines sources, timestamps, ownership and approval controls
- Dashboard design presents exceptions, trends, constraints and required decisions
- Data-quality checks detect missing entries, duplicate records and implausible values
- Electronic logbooks improve traceability while retaining clear handover accountability
- Access controls protect sensitive staffing, safety and production information
- Reporting cadence aligns shift, daily, weekly and monthly management decisions
Participants can plan the controlled implementation of a multi-shift operating improvement.
- Implementation roadmap sequences pilot, review, rollout, stabilisation and audit stages
- Milestone plan identifies dependencies, approvals, resources and decision gates
- Risk register assesses operational, workforce, safety and technology implementation risks
- Training matrix schedules competence development before changed work begins
- Communication calendar coordinates messages for crews, managers and support teams
- Thirty-sixty-ninety-day review plan measures adoption, results and corrective actions
Participants can build, review and present a complete multi-shift operations management plan for a defined operating area.
- Operating-area profile defines demand, assets, workflows, constraints and customer commitments
- Shift pattern and staffing model tested against workload and absence scenarios
- Handover process specifies records, meetings, escalation triggers and accountability
- Performance board combines SQDCP measures, targets, thresholds and review cadence
- Risk controls address fatigue, safety, quality, maintenance and service continuity
- Implementation plan presents priorities, milestones, owners, measures and governance
Exercises and examples are adapted to each cohort's sectors and roles.








