Course modules
21 modules over 10 daysParticipants can explain ISO 50001 requirements and structure an energy management system around the PDCA cycle.
- ISO 50001:2018 clauses and Annex SL high-level structure mapped
- PDCA cycle links energy planning, operations, evaluation and improvement
- Energy performance improvement distinguished from energy efficiency project delivery
- Management-system boundaries, processes, responsibilities and documented information defined
- ISO 50001 relationship with ISO 14001 and ISO 9001 assessed
- Implementation roadmap sequences planning, deployment, checking and management review
Participants can define an appropriate energy management system scope and document relevant organisational conditions.
- Interested-party register distinguishes needs, expectations, risks and applicable requirements
- Organisational scope statement defines boundaries, sites, activities and energy types
- Context analysis connects strategic issues with energy performance commitments
- Climate-change amendment considerations recorded within ISO 50001 context determinations
- Process map identifies accountable owners, inputs, outputs and control points
- Risk and opportunity register prioritises implementation barriers and improvement drivers
Participants can establish leadership commitments, energy policy requirements and accountable governance arrangements.
- Top-management responsibilities translated into visible energy performance commitments
- Energy policy includes continual improvement, information availability and legal compliance
- RACI matrix assigns energy roles, authorities, approvals and escalation routes
- Energy team terms of reference define membership and meeting cadence
- Governance calendar aligns energy decisions with budget and operational cycles
- Policy communication methods reach employees, contractors and relevant external parties
Participants can assess energy data quality and create a useful consumption profile for energy planning.
- Energy source inventory covers electricity, fuels, steam, heat and renewable generation
- Meter hierarchy traces utility supply through distribution and end uses
- Data-quality checks test completeness, accuracy, timing and unit consistency
- Load profiles reveal baseload, peaks, shutdown losses and abnormal consumption
- Tariff analysis separates demand charges, consumption charges and time bands
- Energy data register records source, owner, frequency, units and retention
Participants can plan and conduct an energy review using reliable operational and consumption evidence.
- ISO 50001 energy review requirements translated into a documented workflow
- Energy review boundaries align with the approved management-system scope
- Data collection plan combines bills, meters, production and maintenance records
- Walkthrough survey documents equipment, controls, operating hours and observed losses
- Energy balance quantifies major inputs, conversions, distribution losses and outputs
- Assumptions register records missing data, estimation methods and confidence limits
Participants can identify significant energy uses and rank improvement opportunities using stated criteria.
- Significant energy use criteria combine consumption, control, risk and improvement potential
- Pareto analysis ranks equipment, processes and buildings by energy consumption
- SEU register records relevant variables, responsible persons and operational criteria
- Opportunity register separates behavioural, maintenance, control and capital measures
- Simple payback, net present value and internal rate of return compared
- Prioritisation matrix scores savings, cost, risk, disruption and implementation readiness
Participants can select and document EnPIs that fairly represent energy performance.
- ISO 50006 principles guide EnPI selection, definition and documentation
- Relevant variables include production, occupancy, weather, operating hours and product mix
- Specific energy consumption relates energy use to a meaningful activity driver
- EnPI hierarchy connects site, process, asset and operational performance measures
- Regression analysis tests relationships between energy consumption and relevant variables
- EnPI specification records formula, boundaries, data sources and update frequency
Participants can establish energy baselines and explain when normalisation or adjustment is required.
- ISO 50006 baseline requirements applied to selected EnPIs and periods
- Baseline period selection considers representative operations, data quality and material changes
- Routine adjustments account for relevant-variable changes within the operating range
- Non-routine adjustments address facility changes, product changes and major disruptions
- Regression diagnostics test model fit, residual patterns and outlier influence
- Baseline documentation states assumptions, equations, adjustment rules and approval authority
Participants can convert energy-review findings into measurable objectives, targets and controlled action plans.
- Energy objectives align policy commitments with material energy performance priorities
- SMART targets specify measures, baselines, deadlines, owners and review points
- Action plans define tasks, resources, risks, dependencies and verification methods
- Marginal abatement cost curves compare energy and emissions reduction options
- Capital and operational measures separated for budget approval and delivery control
- Benefits-realisation register tracks planned savings, realised savings and variance explanations
Participants can design a monitoring and measurement plan that supports trustworthy performance evaluation.
- Monitoring plan links EnPIs, meters, variables, thresholds and reporting intervals
- Measurement uncertainty assessed through meter accuracy, calibration and data handling
- IPMVP options compared for retrofit isolation, whole-facility and calibrated simulation
- M&V plan defines boundary, baseline, adjustments, data sources and reporting
- Control charts distinguish normal variation from energy performance deterioration
- Exception reports trigger investigation when EnPI results exceed agreed limits
Participants can develop operational controls for significant energy uses and related work activities.
- Operational criteria define efficient setpoints, schedules, loads and shutdown conditions
- Standard operating procedures embed energy controls within routine operating tasks
- Start-up and shutdown checklists prevent avoidable utility and process losses
- Preventive maintenance plans address compressed air, steam, HVAC and motor systems
- Contractor controls communicate energy requirements, access rules and performance expectations
- Deviation process records temporary operating changes and approval responsibilities
Participants can integrate life-cycle energy performance criteria into design and purchasing decisions.
- Design specification incorporates energy performance requirements and measurement provisions
- Life-cycle cost analysis compares purchase price, energy, maintenance and disposal costs
- Minimum energy performance specifications define acceptable equipment selection criteria
- Procurement evaluation weights energy performance, reliability, cost and supplier evidence
- Commissioning plans verify installed controls, metering and design performance assumptions
- Renewable electricity contracts assessed for volume, term, claims and risk allocation
Participants can establish the people, communication and document-control arrangements required by ISO 50001.
- Competence matrix identifies role-specific energy knowledge, skills and evidence
- Training needs analysis distinguishes awareness, operational competence and technical specialist needs
- Awareness messages connect individual actions with SEUs, objectives and consequences
- Communication plan specifies audience, message, channel, owner and feedback route
- Document-control procedure governs approval, revision, access, retention and withdrawal
- Controlled records demonstrate operational control, measurement, audit and review activities
Participants can manage ISO 50001 implementation through staged deployment, ownership and change control.
- Gap assessment compares existing arrangements against each ISO 50001 requirement
- Implementation plan sequences tasks, dependencies, milestones, owners and evidence outputs
- Stakeholder mapping identifies supporters, decision-makers, affected teams and resistance sources
- ADKAR change model structures awareness, desire, knowledge, ability and reinforcement
- Pilot deployment tests controls before wider implementation at comparable sites
- Issue log tracks decisions, blockers, actions, due dates and escalation status
Participants can identify, evaluate and maintain evidence of energy-related compliance obligations.
- Compliance obligations register captures laws, permits, contracts and voluntary commitments
- Applicability assessment identifies affected sites, assets, activities and reporting periods
- Legal update process assigns monitoring sources, review frequency and approval roles
- Compliance evaluation checks evidence against each applicable obligation and criterion
- Energy and carbon reporting requirements mapped to data owners and controls
- Corrective actions address missed reports, expired permits and control failures
Participants can analyse energy performance and prepare decision-ready reports for operational and senior managers.
- Performance dashboard combines EnPIs, baselines, targets, actions and exceptions
- Variance analysis separates consumption changes from production and weather effects
- Waterfall charts explain drivers behind month-on-month energy cost movement
- Energy savings claims reconcile project estimates with measured performance results
- Trend reports distinguish short-term operational issues from sustained performance change
- Escalation thresholds trigger corrective action, technical investigation or management attention
Participants can plan, conduct and report an objective ISO 50001 internal audit.
- ISO 19011 principles guide auditor conduct, evidence collection and reporting
- Audit programme prioritises significant energy uses, risks, changes and prior findings
- Process-based audit trails test inputs, controls, records, outputs and responsibilities
- Interview questions test awareness, competence, control implementation and accountability
- Objective evidence distinguishes documented intent from demonstrated operational practice
- Audit findings classify conformity, nonconformity, observation and improvement opportunity
Participants can prepare management-review inputs that support resourcing and improvement decisions.
- Management review agenda addresses required ISO 50001 inputs and outputs
- Review pack summarises EnPI trends, audit results, compliance and action status
- Resource decisions address people, metering, maintenance, capital and training needs
- Strategic risks consider energy price exposure, supply resilience and transition plans
- Management-review minutes record decisions, owners, deadlines and follow-up evidence
- Board-level narrative connects energy performance with cost, risk and emissions objectives
Participants can manage nonconformities through root-cause analysis, corrective action and effectiveness review.
- Nonconformity process defines containment, correction, root cause and corrective action
- Five Whys analysis traces recurring energy-control failures to underlying causes
- Fishbone diagrams examine people, methods, machines, materials, measurements and environment
- Corrective-action plans assign owners, deadlines, evidence requirements and review dates
- Effectiveness checks test whether actions prevented recurrence under normal conditions
- Continual-improvement register captures lessons, innovations and system enhancement opportunities
Participants can assess readiness for external ISO 50001 certification and close priority evidence gaps.
- Stage one audit readiness checks scope, documented information and implementation maturity
- Stage two audit preparation tests operational evidence, interviews and record availability
- Evidence map links ISO 50001 clauses with owners, documents and records
- Pre-assessment findings prioritised by conformity risk, performance impact and closure effort
- Certification-body interactions distinguished from consultant and internal auditor responsibilities
- Readiness review confirms management approval, audit logistics and corrective-action status
Participants can build, review and present a complete ISO 50001 implementation pack for a defined site or business unit.
- Scope, context, policy and governance materials assembled into one implementation pack
- Energy review identifies SEUs, opportunities, data gaps and accountable owners
- EnPI and baseline model documents variables, assumptions, adjustment rules and limitations
- Objectives and action plan connect measures, budgets, milestones and verification methods
- Operational controls, monitoring plan and evidence map prepared for priority SEUs
- Peer review tests ISO 50001 conformity, practicality, evidence quality and presentation clarity
Exercises and examples are adapted to each cohort's sectors and roles.








