Course modules
16 modules over 10 daysParticipants can define drone mapping requirements from construction decisions, deliverables and tolerances.
- Construction mapping decisions linked to quantities, progress, safety and claims
- UAS roles within contractor, consultant, client and surveyor responsibilities
- Site coordinate systems, vertical datums and project control hierarchy
- Deliverable selection: orthomosaics, surfaces, point clouds, meshes and reports
- Accuracy, currency and resolution requirements defined from construction use cases
- Information handoffs between field crews, BIM coordinators and commercial teams
Participants can establish a compliant governance process for construction drone operations.
- Civil aviation authority rules, site permissions and airspace restrictions
- Operational categories, pilot responsibilities and required flight authorisations
- Privacy, image ownership and consent requirements for construction sites
- Flight records, maintenance logs and operator competency documentation
- Contract clauses allocating data ownership, liability and deliverable acceptance
- Escalation routes for restricted airspace, public interfaces and incidents
Participants can select appropriate drone platforms and sensors for defined construction tasks.
- Multirotor and fixed-wing platforms matched to site size
- RGB cameras, LiDAR sensors and thermal payload capabilities
- Sensor resolution, ground sampling distance and flight-height trade-offs
- RTK and PPK positioning methods for improved georeferencing
- Battery endurance, weather limits and payload constraints assessed
- Procurement specifications distinguishing operator services from equipment supply
Participants can plan survey control arrangements that support defensible mapping accuracy.
- Ground control points positioned for coverage, stability and visibility
- Checkpoints separated from control points for independent accuracy testing
- GNSS observations linked to project grid and vertical datum
- Control-mark design, labelling and protection from site disturbance
- Survey control registers recording coordinates, epochs and verification status
- Datum transformations documented before combining aerial and design data
Participants can prepare a mission plan that addresses site hazards, airspace and data requirements.
- Site reconnaissance identifies obstacles, exclusion zones and launch locations
- Job safety analysis covers people, plant, weather and batteries
- Flight boundaries set from survey extents and required overlap
- Airspace checks account for airports, heliports and temporary restrictions
- Emergency procedures define lost-link, flyaway and incident responses
- Pre-flight checklists confirm aircraft condition, control and communications
Participants can configure image-capture missions for accurate orthomosaics and surface models.
- Nadir missions configured for orthomosaic and terrain-model production
- Frontlap and sidelap selected for terrain, texture and height
- Ground sampling distance calculated from camera geometry and altitude
- Crosshatch patterns improve reconstruction of complex construction features
- Oblique imagery planned for facades, structures and three-dimensional meshes
- Motion blur, shutter speed and lighting conditions managed
Participants can manage field capture activities and preserve a complete evidence record.
- Field briefing aligns pilot, observer, surveyor and site supervisor
- Ground control coordinates verified before imagery collection begins
- Automated flight execution monitored for coverage, battery and signal
- Image quality checks identify blur, gaps and exposure failures
- Weather observations recorded with mission time and operational decisions
- Field logs preserve crew, equipment, settings and anomaly records
Participants can process aerial imagery into traceable mapping datasets.
- Image import checks filenames, geotags, camera model and completeness
- Photo alignment generates sparse point clouds and camera positions
- Ground control marking constrains bundle adjustment and georeferencing
- Dense reconstruction produces classified point clouds and textured meshes
- Orthomosaics generated with suitable projection, resolution and compression
- Processing reports record settings, residuals and reconstruction warnings
Participants can assess whether drone mapping outputs meet specified accuracy and completeness criteria.
- Checkpoint residuals evaluated against horizontal and vertical tolerance criteria
- Root mean square error reported with units and sample counts
- ASPRS positional accuracy standards applied to mapped deliverables
- Visual inspection identifies doming, stitching errors and surface artefacts
- Completeness checks compare delivered coverage against approved survey extents
- Quality records document acceptance, rejection and corrective processing actions
Participants can interpret core mapping outputs for construction-control decisions.
- Orthomosaic interpretation distinguishes imagery evidence from measured survey data
- Digital surface models represent terrain, plant, stockpiles and structures
- Digital terrain models remove surface objects through point classification
- Point-cloud sections reveal levels, slopes, clearances and installed geometry
- Contour generation uses appropriate intervals, smoothing and labelling
- Feature extraction identifies roads, drainage, boundaries and material zones
Participants can derive controlled earthworks and stockpile quantities from mapped surfaces.
- Existing and design surfaces compared using cut-and-fill calculations
- TIN surfaces built from breaklines, boundaries and classified terrain points
- Stockpile boundaries defined around toes, benches and exclusions
- Volume methods compared: base surface, lowest point and triangulation
- Density assumptions separated from measured volumes in material reporting
- Quantity reports state datum, boundaries, dates and accuracy limitations
Participants can create time-based aerial records that support progress reporting and change control.
- Repeatable flight plans establish comparable progress-capture intervals
- Baseline imagery linked to work packages, zones and schedule activities
- Time-series orthomosaics reveal installation status and access changes
- Progress evidence distinguishes observed completion from contractual acceptance
- Annotated maps communicate constraints, interfaces and emerging site issues
- Records retention preserves source imagery, outputs and approval history
Participants can prepare drone mapping data for controlled exchange with project information systems.
- Coordinate reconciliation aligns drone outputs with BIM authoring models
- IFC models overlaid with surfaces for design-to-as-built review
- GIS layers organise site assets, constraints and inspection observations
- Common data environment workflows control revisions, status and approvals
- File formats compared: GeoTIFF, LAS, LAZ, OBJ and DXF
- Metadata schemas record capture date, coordinate reference and processing lineage
Participants can specify drone mapping approaches for inspection and environmental monitoring tasks.
- Roof and facade imagery supports inaccessible-condition inspection planning
- Thermal surveys identify potential moisture, insulation and electrical anomalies
- Slope monitoring compares successive surfaces for movement indicators
- Environmental mapping records drainage, sediment controls and disturbed ground
- Safety observations identify exclusion breaches, congestion and unsafe access
- Inspection findings routed through corrective-action and closeout procedures
Participants can procure and manage drone mapping services using measurable scope and acceptance criteria.
- Scope of work defines extents, deliverables, accuracy and turnaround
- Pricing models compared for flight days, area coverage and deliverables
- Supplier submissions assessed against equipment, experience and quality controls
- Acceptance criteria specify checkpoints, formats, metadata and corrective actions
- Change control addresses weather delays, altered extents and re-flights
- Commercial records connect mapping evidence with valuations and claims
Participants can build, review and present a complete drone mapping package for a construction project.
- Project brief converted into measurable mapping objectives and acceptance criteria
- Mission plan combines airspace checks, hazards, control and capture settings
- Processing workflow specifies imagery, control, outputs and quality checkpoints
- Earthworks or progress analysis produces decision-ready quantified findings
- Client report presents maps, limitations, recommendations and supporting evidence
- Peer review tests technical defensibility, commercial relevance and implementation actions
Exercises and examples are adapted to each cohort's sectors and roles.