Course modules
18 modules over 10 daysParticipants can define a drone mapping project scope, required outputs and acceptance criteria.
- Drone mapping workflow from project brief through validated spatial deliverables
- Orthomosaics, digital surface models, point clouds and textured mesh outputs
- Survey-grade versus visual mapping requirements and associated evidence
- Client specifications translated into measurable data quality acceptance criteria
- Construction, mining, agriculture and environmental monitoring mapping use cases
- Roles of pilot, surveyor, GIS analyst and project manager
Participants can prepare operational plans that address site, airspace and safety controls.
- Airspace checks, local aviation rules and operator authorisation requirements
- Site risk assessment covering people, property, weather and obstacles
- Pre-flight checklists for aircraft, batteries, payloads and communications
- Emergency procedures for lost link, low battery and flyaway events
- Visual observer roles and communication protocols during survey missions
- Privacy, data protection and land-access considerations for aerial capture
Participants can select coordinate reference systems and design appropriate survey control.
- Geographic, projected and vertical coordinate reference systems distinguished
- EPSG codes selected for project location, datum and height requirements
- Ground control points positioned for coverage, stability and visibility
- Checkpoints reserved independently for accuracy assessment and reporting
- RTK, PPK and ground control workflows compared for project needs
- Geoid models and ellipsoidal heights reconciled before data processing
Participants can select aircraft, sensor and camera settings for specified mapping outputs.
- Multirotor and fixed-wing platforms matched to site scale
- RGB, multispectral, thermal and LiDAR sensors compared by application
- Focal length, sensor size and pixel pitch affecting ground resolution
- Rolling shutter and global shutter effects on image geometry
- Camera calibration parameters and lens distortion in photogrammetry
- Payload selection based on accuracy, coverage and operating constraints
Participants can calculate flight parameters that meet resolution and accuracy requirements.
- Ground sampling distance calculated from altitude, focal length and sensor dimensions
- Forward overlap selected for terrain, texture and reconstruction reliability
- Side overlap adjusted for corridor, nadir and oblique missions
- Flight altitude balanced against airspace limits and required resolution
- Motion blur controlled through shutter speed, velocity and lighting
- Image exposure settings established for consistent radiometric capture
Participants can create efficient flight plans for area, corridor and oblique mapping missions.
- Polygon survey boundaries buffered to protect final orthomosaic coverage
- Corridor missions planned with cross-track overlap and terrain following
- Terrain-aware flight plans generated from available elevation information
- Oblique image patterns designed for facades, structures and stockpiles
- Battery cycles, launch locations and contingency landings scheduled
- Mission parameters documented within a field-ready flight plan
Participants can conduct a structured field capture workflow and verify control records.
- Ground control targets installed with stable, identifiable marker designs
- GNSS observations logged with occupation times and quality indicators
- Image capture monitored for exposure, overlap and positional metadata
- Field notes record weather, deviations, incidents and site conditions
- Control coordinates checked against project datum and vertical reference
- Data handover folders structured for traceable office processing
Participants can process aerial imagery into calibrated, georeferenced photogrammetric products.
- Image quality screening identifies blur, exposure failures and missing coverage
- Photo alignment generates camera positions and sparse tie points
- Bundle adjustment refines camera geometry using image observations
- Ground control markers linked to surveyed coordinates during georeferencing
- Dense point clouds generated from validated alignment results
- Processing logs retained for repeatability, troubleshooting and audit evidence
Participants can generate and inspect orthomosaics, DSMs and terrain-related raster outputs.
- Digital surface models represent terrain, vegetation, buildings and equipment
- Digital terrain models require removal of non-ground surface features
- Orthorectification corrects perspective and relief displacement across imagery
- Seamlines and colour balancing reviewed for mosaic consistency
- Raster resolution selected to preserve meaningful detail without excess volume
- NoData areas identified, explained and reported within final metadata
Participants can inspect, classify and prepare drone point clouds for downstream use.
- LAS and LAZ formats compared for storage and data exchange
- Point density evaluated against required feature and terrain detail
- Ground classification separates terrain points from vegetation and structures
- Manual edits correct automated classification errors around complex features
- Outliers, noise and edge artefacts removed using documented rules
- Point-cloud attributes prepared for GIS, CAD and engineering workflows
Participants can test positional accuracy and prepare evidence-based quality reports.
- Independent checkpoints compared with mapped coordinates and elevations
- RMSE calculated for horizontal and vertical positional error assessment
- ASPRS Positional Accuracy Standards applied to report accuracy classes
- Error distributions inspected for bias, outliers and systematic displacement
- Quality-control checks cover coverage, control, geometry and deliverable completeness
- Acceptance reports distinguish achieved accuracy from target project tolerances
Participants can derive terrain measurements and explain their survey assumptions.
- Stockpile volumes calculated against defined base surfaces and boundaries
- Cut-and-fill analysis compares design surfaces with surveyed terrain
- Contour intervals selected according to terrain detail and vertical accuracy
- Profiles and cross-sections extracted along engineering alignment routes
- Breaklines preserve critical terrain features within surface models
- Measurement uncertainty communicated alongside reported volume and elevation values
Participants can integrate drone products with GIS data and prepare decision-ready maps.
- Orthomosaics loaded with correct coordinate systems and raster pyramids
- Drone-derived layers compared against cadastral, utility and design datasets
- Zonal statistics summarise surface values within operational management areas
- Change detection identifies movement, vegetation change and construction progress
- Map layouts communicate scale, accuracy, dates, sources and limitations
- Web-ready raster products prepared with appropriate compression and tiling
Participants can organise drone survey data for retrieval, sharing and auditability.
- Project folder structures separate raw imagery, control, processing and deliverables
- Naming conventions link flights, dates, sensors and processing versions
- Metadata records capture acquisition parameters, coordinate systems and processing methods
- Data retention schedules account for client obligations and storage costs
- Version control prevents accidental replacement of approved survey outputs
- Delivery packages include readme files, licences and known limitations
Participants can diagnose common capture and processing failures and recommend corrections.
- Poor alignment diagnosed through overlap gaps, blur and repetitive texture
- Doming effects investigated using control distribution and camera calibration
- Elevation bias traced to vertical datum, control or geoid errors
- Orthomosaic distortions assessed around moving objects and tall structures
- Vegetation and water limitations recognised before terrain interpretation
- Corrective actions prioritised between reflying, reprocessing and qualified reporting
Participants can write project specifications and operating procedures for drone mapping services.
- Statement of work defines area, outputs, accuracy and delivery format
- Control requirements specify survey method, density and independent checkpoints
- Processing specifications identify software settings, classifications and raster resolution
- Quality acceptance criteria set measurable checks before final approval
- Standard operating procedures assign responsibilities across field and office stages
- Supplier proposals evaluated against technical capability, evidence and project risk
Participants can estimate resources, schedule production and manage delivery risks for mapping projects.
- Work breakdown structures separate planning, capture, processing, checking and delivery
- Resource estimates account for travel, batteries, control and processing capacity
- Weather windows and airspace approvals incorporated into project schedules
- Production rates estimated from site size, image count and hardware capacity
- Risk registers identify technical, operational, regulatory and client dependencies
- Progress reporting links completed outputs with quality status and remaining work
Participants can build, review and present a complete drone mapping project from brief to validated delivery.
- Project brief interpreted into outputs, accuracy targets and delivery constraints
- Flight plan prepared with control design, safety measures and capture parameters
- Imagery processed into orthomosaic, surface model and classified point cloud
- Independent checkpoints used to calculate and report achieved positional accuracy
- Quality review identifies limitations, corrective actions and release decisions
- Final presentation explains methods, findings, deliverables and client recommendations
Exercises and examples are adapted to each cohort's sectors and roles.








