Course modules
20 modules over 10 daysParticipants can map the estimating and bidding process from opportunity identification through project handover.
- Contractor pre-construction functions from opportunity screening through project award
- Tender lifecycle milestones, decision gates, responsibilities and submission deadlines
- Estimator, bid manager, quantity surveyor and project manager accountabilities
- Competitive, negotiated, two-stage and framework procurement route differences
- Bid information flow between client, designers, suppliers and subcontractors
- Estimate basis document as the central record of pricing assumptions
Participants can make evidence-based bid/no-bid recommendations using commercial and delivery criteria.
- Bid/no-bid scorecard covering capability, capacity, risk and strategic fit
- Client payment record, reputation and decision-making intelligence sources
- Assessing site constraints, programme demands and resource availability early
- Competitor profiling without unsupported assumptions or informal price intelligence
- Procurement timetable analysis for enquiry, pricing, review and submission
- Documenting bid decision rationale for management approval and audit
Participants can establish a controlled tender document register and extract pricing requirements.
- Tender document register covering drawings, specifications, schedules and addenda
- Revision control procedures for issued-for-tender drawings and clarifications
- Reading general conditions, special conditions and employer requirements
- Cross-checking drawing notes against specification clauses and schedules
- Request for information logs with ownership, due dates and status
- Identifying conflicts, ambiguities and missing information affecting the estimate
Participants can define estimate scope through a coded work breakdown structure.
- Work breakdown structure aligned with construction sequence and cost control
- CSI MasterFormat divisions for organising trade packages and estimate codes
- UniFormat II elements for early-stage building cost planning
- Scope matrix separating included work, exclusions and client-supplied items
- Interface mapping between civil, structural, architectural and MEP packages
- Coding labour, material, plant and subcontract cost components consistently
Participants can prepare checked quantity take-offs from drawings and specifications.
- Manual dimension sheets for lengths, areas, volumes and item counts
- Taking off excavation quantities using sections, contours and formation levels
- Concrete, reinforcement and formwork quantities from structural drawings
- Wall, floor, ceiling and finishes take-offs from architectural plans
- Measurement checklists preventing duplicated quantities and unmeasured scope
- Independent take-off checks using reasonableness ratios and drawing reconciliation
Participants can organise measured work into clear and auditable pricing items.
- Bills of quantities, schedules of rates and lump-sum price structures
- Unit descriptions defining location, material, workmanship and measurement basis
- Provisional sums, prime cost sums and daywork treatment
- Separating measured work from preliminaries, attendance and temporary works
- Pricing alternates, options and client-requested value engineering items
- Reconciliation between take-off sheets, bill items and estimate codes
Participants can build labour cost estimates using crew outputs and burdened rates.
- Labour rate build-up including wages, payroll burdens and allowances
- Crew composition matched to trade methods and planned outputs
- Production rate calculations from quantity, crew hours and working time
- Adjusting productivity for access, congestion, weather and learning effects
- Overtime, shift work and premium-time cost implications
- Benchmarking labour hours against completed projects and published norms
Participants can price material and plant resources with documented sourcing assumptions.
- Material pricing from supplier quotations, catalogues and historical purchase data
- Waste factors, cutting losses, laps and breakage allowances
- Equipment ownership cost using depreciation, fuel, maintenance and operator inputs
- Rental plant comparisons using minimum hire periods and mobilisation charges
- Freight, storage, offloading and handling costs within material pricing
- Recording quotation validity, lead times and currency assumptions
Participants can issue scoped subcontract enquiries and evaluate returned tenders.
- Subcontract enquiry packages containing scope, drawings, terms and return dates
- Bidder lists based on capability, workload, location and financial standing
- Levelling subcontract quotations against a common scope matrix
- Normalising exclusions, qualifications, provisional items and payment terms
- Assessing subcontractor programme, resources and proposed construction methodology
- Documenting recommendation rationale before subcontractor selection approval
Participants can convert proposed construction methods into measurable cost allowances.
- Method statements as sources for labour, plant and temporary works
- Site logistics planning for access, laydown, lifting and material movement
- Temporary works allowances for excavation support, access and protection
- Construction sequencing effects on crew continuity and equipment utilisation
- Off-site fabrication decisions compared with site installation costs
- Method-related assumptions recorded within the estimate basis document
Participants can calculate time-related and fixed preliminaries for a tender.
- Preliminaries schedule covering management, welfare, security and site establishment
- Time-related costs calculated from programme duration and staffing levels
- Fixed-cost items including permits, insurances, surveys and mobilisation
- Site office, utilities, communications and consumables cost allowances
- Health, safety and environmental requirements priced from tender obligations
- Allocating shared site resources across work packages without double counting
Participants can link a tender programme to resource, preliminary and cash requirements.
- Critical path method logic linking activities, durations and completion milestones
- Resource loading activities with labour, plant and subcontract requirements
- Programme duration effects on preliminaries, escalation and working capital
- Milestone constraints, sectional completion and liquidated damages exposure
- Testing programme assumptions against site access and procurement lead times
- Time-phased estimate summaries supporting cash-flow and management review
Participants can quantify tender risk and document appropriate contingency allowances.
- Risk register linking cause, event, consequence, owner and response
- Probability-impact scoring for prioritising estimate risks and opportunities
- Expected monetary value calculations for identified cost risk events
- Contingency allowances separated from scope omissions and management reserve
- Price escalation analysis using procurement timing and market indicators
- Risk workshops challenging assumptions before final tender price approval
Participants can identify contractual provisions that require pricing, qualification or escalation.
- Payment terms, retention, advance payments and working-capital implications
- Liquidated damages, delay obligations and completion milestone exposure
- Variation procedures, notice requirements and valuation mechanisms
- Price adjustment clauses, currency provisions and tax treatment
- Bonds, guarantees and insurance requirements included within bid costs
- Commercial qualifications drafted without contradicting tender instructions
Participants can consolidate detailed costs into a controlled estimate summary.
- Direct-cost summary by work package, resource type and cost code
- Checking arithmetic, units, rates and quantity extensions systematically
- Estimate reconciliation against initial budget, benchmarks and prior tenders
- Cost drivers analysis identifying high-value and high-risk estimate items
- Overhead allocation and profit mark-up decisions within approval limits
- Estimate basis narrative explaining methods, assumptions and commercial positions
Participants can obtain, compare and select supplier quotations for tender pricing.
- Request for quotation documents defining quantities, specifications and delivery requirements
- Supplier bid tabulations comparing rates, lead times and commercial terms
- Apples-to-apples comparison adjustments for scope gaps and freight differences
- Clarification records resolving inconsistent technical and commercial responses
- Fallback pricing methods when compliant quotations are unavailable
- Supplier selection recommendations supported by price, risk and capacity evidence
Participants can recommend a bid strategy aligned with client priorities and market conditions.
- Client evaluation criteria translated into pricing, programme and proposal priorities
- Target price positioning informed by cost base and market intelligence
- Value engineering proposals with quantified savings and delivery implications
- Bid differentiators supported by evidence, not unsupported marketing claims
- Pricing sensitivity analysis for major quantities, rates and risk allowances
- Management approval thresholds for margin, contingency and commercial departures
Participants can prepare a compliant submission and lead a structured bid review.
- Tender compliance checklist covering forms, signatures, bonds and attachments
- Submission schedules coordinating technical, commercial and administrative deliverables
- Bid review agenda covering scope, risks, price and approval actions
- Red-team review techniques testing omissions, arithmetic and contractual exposures
- Clarification and qualification registers controlled before tender submission
- Final submission verification against client instructions and portal requirements
Participants can manage post-tender engagement and transfer priced assumptions to delivery teams.
- Post-tender clarification responses preserving approved pricing and qualifications
- Best-and-final offer decisions supported by revised risk assessment
- Tender interview preparation using estimate evidence and construction methodology
- Bid-to-project handover checklist for scope, allowances and procurement commitments
- Estimate handover meeting between bid team, project team and commercial staff
- Capturing tender outcomes for estimating database and lessons learned
Participants can build, review and present a complete construction tender estimate and bid recommendation.
- Compile controlled quantities, resource rates, quotations and preliminaries into one estimate
- Prepare estimate basis, scope matrix, exclusions and clarification register
- Quantify risk allowances, escalation exposure and proposed tender mark-up
- Conduct bid review using compliance, cost, risk and programme evidence
- Present tender recommendation, commercial qualifications and approval requirements clearly
- Defend pricing assumptions against structured management and client questions
Exercises and examples are adapted to each cohort's sectors and roles.