20 modules over 10 daysParticipants can frame a coastal infrastructure problem as a measurable public-service project.
- Coastal system boundaries, catchment interactions, and asset dependencies mapped
- Problem statements distinguish protection, access, drainage, and development needs
- Service-area definition links beneficiaries, users, operators, and affected communities
- Project objectives converted into measurable service, resilience, and fiscal criteria
- Logic models connect inputs, outputs, outcomes, and long-term impacts
- Initial project charter records scope, assumptions, constraints, and decision gates
Participants can assess the coastal hazards and climate scenarios that should shape project scope.
- Wave climate, tides, currents, sediment transport, and storm surge fundamentals
- Hazard chains identify compound flooding, erosion, overtopping, and infrastructure failure
- Climate scenarios translate sea-level rise into design and operational implications
- Return periods, exceedance probabilities, and design events interpreted correctly
- Exposure mapping identifies people, assets, ecosystems, and economic activities
- Vulnerability assessment distinguishes physical susceptibility from adaptive capacity
Participants can define demand and service gaps using evidence suitable for investment decisions.
- Baseline surveys establish asset condition, utilisation, outages, and maintenance history
- Demand forecasts separate population growth, tourism, trade, and land-use drivers
- Level-of-service indicators specify protection, access, reliability, and response times
- User segmentation distinguishes households, businesses, port operators, and visitors
- Counterfactual analysis describes expected conditions without proposed intervention
- Data-quality assessments document gaps, uncertainty, sources, and validation actions
Participants can screen potential sites against physical, social and delivery constraints.
- GIS suitability mapping combines hazard, elevation, access, land, and ecology layers
- Setback lines and coastal-zone plans tested against proposed asset footprints
- Bathymetric, topographic, geotechnical, and hydrological surveys scoped proportionately
- Utility corridors, navigation channels, and evacuation routes mapped early
- Site-access constraints identify construction logistics, staging, and material supply issues
- Spatial alternatives record excluded locations and defensible screening reasons
Participants can develop and compare feasible structural, nature-based and hybrid options.
- Breakwaters, groynes, seawalls, revetments, and raised assets matched to functions
- Mangroves, dunes, wetlands, and reefs assessed as protective infrastructure
- Hybrid options combine engineered structures with ecosystem restoration measures
- Multi-criteria analysis compares cost, performance, land, safeguards, and maintainability
- Design life, adaptability, and failure consequences tested under climate scenarios
- Preferred-option rationale records trade-offs and residual risks transparently
Participants can identify safeguard requirements and incorporate them into project preparation.
- Environmental and social screening identifies material impacts and assessment requirements
- Mitigation hierarchy applies avoid, minimise, restore, and offset decisions
- Biodiversity critical-habitat risks assessed before selecting coastal protection alignments
- Resettlement risks identify land acquisition, livelihood, and access impacts
- Stakeholder engagement plans define disclosure methods, timing, and grievance channels
- Environmental and social management plans assign actions, budgets, and responsibilities
Participants can assess land, tenure and institutional issues that affect project viability.
- Land-tenure mapping identifies public parcels, private rights, leases, and customary claims
- Easements and wayleaves secure access for drainage, utilities, and maintenance
- Foreshore ownership rules tested against reclamation and shoreline protection proposals
- Institutional mapping clarifies owner, regulator, operator, funder, and approver roles
- Interagency agreements define data sharing, permits, and asset handover responsibilities
- Approval pathways sequence planning, environmental, maritime, and budget authorisations
Participants can design stakeholder engagement that supports informed and legitimate project decisions.
- Stakeholder mapping ranks influence, interests, impacts, and engagement priorities
- Power-interest grids identify groups requiring early consultation and formal agreements
- Consultation records distinguish information sharing, feedback, negotiation, and consent
- Risk communication explains uncertainty, residual risk, and service limitations clearly
- Benefit-sharing measures address access, livelihoods, local employment, and amenities
- Grievance mechanisms set intake routes, response standards, escalation, and reporting
Participants can determine whether a PPP is suitable and identify an appropriate delivery model.
- PPP screening tests service measurability, revenue potential, and risk-transfer feasibility
- Traditional procurement, management contracts, concessions, and availability PPPs compared
- Output specifications define required service without prescribing unnecessary design solutions
- Market sounding tests bidder appetite, capability, financing interest, and constraints
- Public-sector comparator establishes a baseline for delivery-model assessment
- PPP suitability memorandum records rationale, conditions, and next-stage evidence needs
Participants can develop credible payment mechanisms and commercial structures for coastal assets.
- User-charge analysis tests willingness to pay, collection cost, and equity effects
- Availability payments link deductions to measurable asset and service performance
- Tariff structures distinguish fixed charges, usage fees, and seasonal pricing
- Land-value capture assesses betterment levies, leases, and development contributions
- Viability-gap funding identifies justified public support and disbursement triggers
- Revenue waterfalls prioritise operating costs, reserves, debt service, and distributions
Participants can estimate lifecycle cost drivers and document assumptions for financial analysis.
- Capital-cost breakdown structures separate enabling works, civil works, and equipment
- Quantity-based estimates apply unit rates, contingencies, escalation, and taxes
- Operating-cost models include staffing, energy, inspections, dredging, and repairs
- Lifecycle cost analysis compares replacement cycles, maintenance regimes, and residual value
- Contingency allowances reflect design maturity, ground conditions, and market volatility
- Cost-estimate bases document prices, dates, exclusions, and confidence ranges
Participants can construct and review core financial-model assumptions for a coastal project.
- Sources-and-uses schedules reconcile capital costs with committed funding sources
- Debt sizing uses debt-service coverage ratio and lender reserve assumptions
- Cash-flow models forecast construction drawdowns, operations, financing, and taxes
- Weighted average cost of capital reflects debt, equity, grants, and risk
- Sensitivity analysis tests demand, costs, delays, inflation, and refinancing assumptions
- Financial-model audit checks formulas, sign conventions, links, and scenario controls
Participants can allocate material project risks to parties able to manage them effectively.
- Risk registers describe cause, event, consequence, owner, and treatment actions
- PPP risk matrices allocate design, construction, demand, and force-majeure risks
- Climate risks distinguish insurable events from adaptation and residual risks
- Risk workshops test allocation against control, pricing, and contractual enforceability
- Monte Carlo simulation estimates cost and schedule uncertainty distributions
- Risk-adjusted contingencies link quantified exposure to funding and decision thresholds
Participants can test whether a proposed coastal project is affordable and provides value for money.
- Affordability analysis compares annual commitments with budget ceilings and funding reliability
- Value-for-money analysis compares whole-life costs, risk transfer, and service outcomes
- Fiscal-commitment registers capture guarantees, termination payments, and contingent liabilities
- Discounted cash-flow analysis calculates net present cost under delivery alternatives
- Scenario testing assesses tariff support, payment deductions, and refinancing outcomes
- Gateway reviews identify decisions requiring ministerial, treasury, or board approval
Participants can prepare a procurement strategy and identify essential contract provisions.
- Procurement plans set market approach, timetable, governance, and evaluation stages
- Prequalification criteria test technical capability, financial capacity, and relevant experience
- Bid evaluation matrices weight quality, price, financing, and resilience commitments
- FIDIC contract forms distinguish design responsibility, payment, and claims processes
- Performance specifications define availability, response times, inspection, and maintenance standards
- Contract clauses address change control, step-in rights, termination, and disputes
Participants can integrate operational resilience, insurance and emergency requirements into project plans.
- Resilience standards define tolerable downtime, recovery targets, and critical functions
- Business continuity plans address warnings, shutdowns, evacuation, and service restoration
- Insurance programmes allocate property damage, business interruption, and liability exposures
- Parametric insurance triggers assessed for cyclone, flood, and storm-surge events
- Emergency operating procedures assign command roles, communications, and mutual aid
- Post-disaster reconstruction protocols preserve evidence, funding eligibility, and resilience improvements
Participants can plan delivery controls for complex coastal construction and rehabilitation works.
- Construction sequencing accounts for tidal windows, weather seasons, and marine access
- Interface registers coordinate contractors, utilities, port operations, and local authorities
- Baseline programmes identify critical paths, float, milestones, and approval dependencies
- Change-control procedures assess scope, cost, schedule, and risk implications
- Quality assurance plans define inspection points, test records, and acceptance criteria
- Claims-prevention records maintain notices, contemporaneous evidence, and decision logs
Participants can specify lifecycle asset-management arrangements for completed coastal infrastructure.
- Asset registers capture location, condition, criticality, ownership, and maintenance history
- ISO 55000 principles connect asset value, lifecycle decisions, and governance
- Maintenance strategies distinguish preventive, predictive, corrective, and emergency interventions
- Condition assessments prioritise corrosion, scour, settlement, erosion, and structural defects
- Key performance indicators track availability, response, safety, condition, and expenditure
- Handback requirements define residual life, inspections, records, and remediation obligations
Participants can establish governance and assurance arrangements from preparation through operations.
- Project governance structures define sponsor, steering committee, and accountable executive roles
- RACI matrices assign decision rights, approvals, consultation, and reporting duties
- Stage-gate assurance tests readiness before feasibility, procurement, contract award, and operations
- Benefits-realisation plans track service outcomes, resilience gains, and economic effects
- Monitoring frameworks specify indicators, baselines, targets, sources, and reporting frequency
- Independent review scopes address technical, financial, environmental, and legal assumptions
Participants can build, review and present a complete coastal infrastructure project dossier with a preferred option, financing case, risk allocation, procurement strategy and implementation plan.
- Project dossier integrates problem definition, evidence base, options, and preferred solution
- Financial case consolidates lifecycle costs, revenues, funding, affordability, and sensitivities
- Risk allocation matrix aligns contractual responsibilities with mitigation and monitoring actions
- Procurement strategy sets delivery model, timetable, evaluation criteria, and approvals
- Implementation roadmap sequences studies, permits, financing, procurement, construction, and operations
- Review panel presentation defends recommendations, assumptions, trade-offs, and decision requests
Exercises and examples are adapted to each cohort's sectors and roles.