Course modules
19 modules over 10 daysParticipants can frame project value for money using clear decision criteria and accountability requirements.
- Value for money defined through economy, efficiency, effectiveness and equity
- Distinguishing project outputs, outcomes, benefits, disbenefits and distributional effects
- Public value, fiduciary duty and stewardship in investment decisions
- Mapping decision rights between sponsor, board, delivery team and users
- Tracing how weak appraisal produces avoidable cost, delay and benefit shortfalls
- Creating a project value statement with measurable decision criteria
Participants can show how a project is expected to create measurable strategic and operational benefits.
- Developing a benefits map linking interventions, outputs, outcomes and strategic objectives
- Logic models test causal assumptions before expenditure commitments are approved
- Theory of change identifies external conditions, risks and contribution pathways
- Benefit profiles specify owner, baseline, target, timing and evidence source
- Disbenefit registers expose negative effects requiring mitigation or acceptance decisions
- Aligning project measures with corporate plans, statutory duties and service standards
Participants can establish a credible problem statement and evidence baseline for project appraisal.
- Problem statements distinguish symptoms, root causes, constraints and affected groups
- Using five whys and fishbone analysis to investigate performance gaps
- Baseline measures establish current cost, quality, demand and service performance
- Segmenting beneficiaries, users and non-users to expose unequal project effects
- Data quality assessments test completeness, accuracy, timeliness and comparability
- Documenting evidence gaps, assumptions and planned validation actions
Participants can develop a balanced longlist and defensible shortlist of project options.
- Do-nothing and do-minimum options establish credible appraisal comparators
- Longlisting interventions through process redesign, technology, sourcing and policy changes
- Applying SWOT analysis to expose option-specific strengths and constraints
- Critical success factors screen options before detailed financial analysis
- Shortlisting criteria address strategic fit, feasibility, affordability and deliverability
- Recording rejected options with transparent reasons and supporting evidence
Participants can identify, structure and estimate the full cost of project options.
- Whole-life costing captures acquisition, operation, maintenance, renewal and disposal costs
- Work breakdown structures organise cost estimates by deliverable and activity
- Direct, indirect, fixed and variable costs classified for decision use
- Cost drivers connect resource consumption to demand, volume and complexity
- Capital and operating expenditure separated for approval and funding purposes
- Contingency estimates reflect quantified risk exposure and estimate maturity
Participants can build and interpret financial appraisal models for competing project options.
- Cash flow profiles show timing of expenditure, savings, income and residual value
- Discounted cash flow converts future costs and benefits into present values
- Net present value compares options with different timing and funding requirements
- Internal rate of return interpreted alongside strategic and non-financial criteria
- Payback period identifies liquidity exposure but excludes later value
- Inflation, price escalation and real terms treated consistently within models
Participants can assess whether monetised benefits justify the costs and risks of an option.
- Cost-benefit analysis compares monetised social, economic and financial effects
- Identifying incremental costs and benefits against the approved comparator
- Shadow pricing values goods where market prices misstate social cost
- Avoided costs, productivity gains and revenue effects quantified transparently
- Double counting checks prevent duplicated benefits within appraisal models
- Benefit-cost ratios communicate relative returns alongside net present value
Participants can compare options when important outcomes cannot be reliably monetised.
- Cost-effectiveness analysis compares unit costs against a defined outcome measure
- Selecting outcome units such as cases prevented, learners retained or downtime reduced
- Multi-criteria analysis weights financial, operational, social and environmental criteria
- Scoring rules define evidence thresholds before option evaluation begins
- Sensitivity testing examines whether rankings change under alternative weights
- Presenting non-monetised effects without disguising judgement as fact
Participants can test whether a preferred option can be funded and sustained.
- Affordability assessment compares annual funding needs against approved budget envelopes
- Budget impact analysis identifies cash pressure during implementation and transition
- Funding sources distinguished between capital allocations, grants, loans and operating budgets
- Phasing expenditure aligns commitments with procurement, delivery and benefits timing
- Working capital requirements identify short-term cash exposure before benefits arrive
- Exit costs and stranded assets considered when replacing existing services
Participants can test the resilience of value-for-money conclusions under uncertainty.
- Risk registers link threats and opportunities to cost, schedule and benefits
- Three-point estimating uses optimistic, most likely and pessimistic cost assumptions
- Sensitivity analysis tests the variables with greatest decision influence
- Scenario analysis models plausible combinations of demand, price and delivery conditions
- Monte Carlo simulation produces probability distributions for cost and schedule outcomes
- Break-even analysis identifies conditions under which an option ceases creating value
Participants can plan ownership, measurement and intervention for benefits after project approval.
- Benefits realisation plans assign accountable owners beyond project closure
- Benefit dependency networks reveal required capabilities, decisions and operational changes
- Leading indicators provide early evidence before outcome measures mature
- Benefits registers track forecast, realised, deferred and disallowed benefits
- Transition plans transfer accountability from project teams to operational managers
- Corrective actions address benefit slippage, adoption barriers and ownership gaps
Participants can design procurement evaluations that assess price, quality, risk and whole-life value.
- Procurement strategies match market conditions, risk allocation and project objectives
- Specification design defines outcomes, service levels and measurable acceptance criteria
- Total cost of ownership compares bids beyond initial purchase price
- Weighted evaluation models score quality, price, social value and delivery risk
- Supplier due diligence examines capacity, financial standing and past performance
- Contract incentives align payment mechanisms with outputs, outcomes and service reliability
Participants can identify operational measures that improve project delivery efficiency without reducing outcomes.
- Process mapping identifies handoffs, rework, queues and non-value-adding activities
- Lean waste categories expose delays, defects, overprocessing and excess inventory
- Capacity analysis compares resource availability against planned workload and demand
- Productivity measures relate outputs to labour, materials, equipment and time
- Make-or-buy analysis compares internal delivery with outsourced service options
- Resource smoothing resolves avoidable peaks without extending critical activities
Participants can use earned value data to forecast cost and schedule performance.
- Performance measurement baselines integrate scope, schedule, budget and control accounts
- Planned value, earned value and actual cost explained through project data
- Cost performance index identifies spending efficiency against completed work
- Schedule performance index identifies progress variance against approved plans
- Estimate at completion forecasts final cost using current performance trends
- Variance narratives distinguish temporary deviations from structural delivery problems
Participants can assess how project costs and benefits are distributed among affected groups.
- Equity analysis identifies groups receiving benefits, bearing costs or facing exclusion
- Distributional impact assessment examines location, income, gender, disability and access
- Social value criteria translate community outcomes into procurement evaluation evidence
- Stakeholder analysis identifies influence, interests, dependencies and engagement requirements
- Accessibility requirements incorporated into option design, costs and acceptance criteria
- Documenting trade-offs where aggregate value conflicts with fairness considerations
Participants can prepare value-for-money evidence for project governance and independent assurance.
- Stage-gate reviews test evidence maturity before releasing further funding
- The Five Case Model structures strategic, economic, commercial, financial and management evidence
- Assurance plans define reviewers, evidence requirements, timing and escalation routes
- Audit trails connect decisions to source data, assumptions and approval records
- Decision logs record choices, rationale, conditions and accountable decision makers
- Red flags identify optimism bias, scope creep, unsupported savings and unmanaged dependencies
Participants can communicate appraisal conclusions clearly to sponsors, boards and funders.
- Executive summaries state recommendation, value case, risks and approval sought
- Option appraisal tables present comparable costs, benefits, risks and assumptions
- Dashboards combine delivery progress, financial performance and benefits indicators
- Waterfall charts explain changes between approved budget, forecast and outturn
- RAG criteria use defined thresholds rather than subjective status reporting
- Recommendations distinguish evidence, professional judgement, dependencies and required decisions
Participants can evaluate whether a completed project delivered its intended value for money.
- Post-implementation reviews compare realised outcomes against approved business case forecasts
- Benefits evaluation tests attribution, contribution, sustainability and unintended consequences
- Actual whole-life costs compared with estimates, contingencies and funding assumptions
- Lessons logs capture repeatable practices, failed assumptions and control weaknesses
- Independent review scopes protect objectivity when evaluating sponsor-led initiatives
- Closure recommendations assign actions for benefits continuation and future appraisals
Participants can assemble and present a complete value-for-money assessment, benefits plan and assurance case for a project.
- Defining the decision problem, baseline, affected groups and strategic objectives
- Building options, whole-life costs, benefits estimates and affordability profiles
- Applying cost-benefit, cost-effectiveness or multi-criteria analysis to selected options
- Testing key assumptions through sensitivity, scenario and risk analysis
- Preparing benefits realisation, procurement, governance and assurance actions
- Presenting recommendation, evidence limitations and approval conditions to review panel
Exercises and examples are adapted to each cohort's sectors and roles.








