Course modules
20 modules over 10 daysParticipants can map the infrastructure systems and institutional relationships required for serviced housing delivery.
- Housing delivery chain from land assembly through occupancy and asset operations
- Site infrastructure distinguished from trunk networks and regional service systems
- Infrastructure service levels matched to density, tenure and household affordability
- Municipal, utility, developer and community responsibilities mapped through RACI
- Development sequencing aligned with access, utilities, social facilities and occupancy
- Common coordination failures causing stranded housing assets and cost escalation
Participants can translate a land-use concept into coordinated infrastructure requirements.
- Land-use plans tested against infrastructure carrying capacity and service catchments
- Density scenarios calculated using gross-to-net ratios and plot yield assumptions
- Transit-oriented development principles applied to station-area housing schemes
- Street hierarchies linked with emergency access, freight movement and walkability
- Utility corridors reserved within layouts before plot subdivision and construction
- Social infrastructure catchments sized for schools, clinics, parks and markets
Participants can prepare a demand baseline and forecast for infrastructure investment planning.
- Baseline datasets assembled from census, utility, cadastral and mobility records
- Population projections built using cohort-component and household formation assumptions
- Water demand estimated from per-capita consumption and non-revenue water factors
- Peak wastewater flows calculated using dry-weather and infiltration allowances
- Transport trip generation estimated by land use, mode share and occupancy
- Demand scenarios stress-tested for delayed occupancy and informal settlement growth
Participants can specify coordinated site-servicing requirements and critical network interfaces.
- Water supply options compared through source yield, pressure and storage requirements
- Gravity sewer layouts checked against topography, gradients and downstream capacity
- Stormwater systems designed using rational method parameters and detention storage
- Electricity loads forecast from dwelling typologies, diversity factors and connections
- Solid waste collection planned around access geometry, storage and transfer points
- Utility interface register records approvals, tie-ins, dependencies and ownership
Participants can integrate mobility and public-realm investments into housing infrastructure plans.
- Complete Streets principles applied to housing access roads and collector corridors
- Pedestrian catchments measured using network distance rather than straight lines
- Public transport service plans matched with density, frequency and interchange demand
- Parking requirements tested against affordability, mode share and land consumption
- Universal design requirements incorporated into crossings, footways and public facilities
- Public realm maintenance responsibilities assigned through asset ownership schedules
Participants can incorporate climate, environmental and disaster-risk measures into infrastructure options.
- Climate risk screening uses hazard, exposure and vulnerability assessment matrices
- Flood pathways mapped from catchment topography, drainage failures and blocked outfalls
- Nature-based drainage compared with conventional pipes using lifecycle cost criteria
- Heat mitigation planned through canopy cover, cool materials and shaded routes
- Environmental and social impact assessment scoping identifies priority receptors early
- Resettlement risks screened using land acquisition, displacement and livelihood criteria
Participants can sequence infrastructure packages around development triggers and delivery dependencies.
- Critical path method identifies enabling works, approvals and network connection dependencies
- Phasing plans link housing completions with service capacity commissioning milestones
- Trigger-based infrastructure schedules define thresholds for developer and municipal works
- Temporary services assessed against transition costs, safety and asset compatibility
- Interface management plans assign control of boundaries between contract packages
- Implementation schedules integrate procurement lead times, permits and utility outages
Participants can estimate capital and lifecycle costs for integrated infrastructure alternatives.
- Work breakdown structures separate land, networks, buildings and professional services
- Quantity-based estimates use unit rates, contingencies and escalation assumptions
- Lifecycle cost analysis includes renewals, operations, maintenance and residual values
- Net present value compares infrastructure options over defined asset lives
- Cost benchmarks normalized by dwelling, hectare, connection and service population
- Optimism bias allowances applied to early-stage cost estimates and schedules
Participants can assess household affordability and identify appropriate subsidy mechanisms.
- Household affordability ratios test housing, utility and transport payment burdens
- Willingness-to-pay evidence distinguished from ability-to-pay household income data
- Tariff structures compared using fixed charges, volumetric rates and lifeline blocks
- Capital subsidies separated from operating subsidies and targeted support mechanisms
- Cross-subsidy options assessed across land uses, customer classes and service areas
- Fiscal commitments recorded through multi-year budget and contingent liability schedules
Participants can assemble realistic funding plans for public and shared infrastructure.
- Municipal revenue sources assessed through own-source income and intergovernmental transfers
- Capital investment plans prioritize projects using strategic fit and readiness criteria
- Development charges calculated from attributable infrastructure costs and growth forecasts
- Land value capture instruments compared for legal basis and collection timing
- Municipal bonds evaluated against revenue pledges, debt limits and credit quality
- Blended finance structures combine grants, debt, equity and viability-gap funding
Participants can screen urban infrastructure projects and recommend a justified delivery option.
- Project concept notes define service problem, beneficiaries and measurable outputs
- Multi-criteria analysis ranks options using cost, equity, resilience and feasibility
- Theory of change connects infrastructure interventions with intended development outcomes
- Economic appraisal distinguishes financial cash flows from economic costs and benefits
- Value-for-money screening compares public procurement with potential PPP arrangements
- Gateway reviews test strategic case, affordability, readiness and market interest
Participants can select a PPP model suited to project revenues and public service obligations.
- Management, lease, concession and availability-payment models compared systematically
- Design-build-finance-maintain structures matched to asset condition and payment certainty
- User-pay revenues assessed for collection risk, tariff control and demand volatility
- Availability payments specified through service outputs, deductions and indexation
- Hybrid PPP structures combine public capital grants with private operating obligations
- Unsolicited proposal risks addressed through transparent competitive procurement procedures
Participants can develop a risk allocation matrix and core contractual protections.
- Risk register identifies probability, impact, owner, mitigation and residual exposure
- Construction risk allocated through design responsibility, completion tests and damages
- Demand risk assessed against occupancy, tariff policy and competing service providers
- Force majeure provisions distinguish relief events, compensation and termination rights
- Change-in-law mechanisms address cost impacts and regulatory responsibility
- Performance regimes connect key performance indicators with deductions and remedies
Participants can build and interpret a project-level PPP financial model.
- Model structure separates assumptions, calculations, outputs and sensitivity cases
- Sources-and-uses schedules reconcile construction cost, financing fees and contingencies
- Operating cash flows model revenues, expenses, renewals and working capital
- Debt service coverage ratio calculated from cash available for debt service
- Equity returns measured using internal rate of return and distributions
- Sensitivity analysis tests inflation, demand, capex, interest rates and delays
Participants can identify bankability gaps and prepare actions to address them.
- Bankability assessment reviews revenue certainty, counterparties, permits and security
- Lender due diligence covers technical, legal, environmental and insurance evidence
- Direct agreements define lender step-in rights and cure periods
- Credit enhancement options include guarantees, escrow accounts and payment reserves
- Termination payment formulas address debt, equity and default scenarios
- Financial close conditions tracked through a responsibilities and evidence register
Participants can plan a transparent procurement process and targeted market engagement.
- Procurement routes selected using project complexity, competition and preparation maturity
- Market sounding tests bidder appetite, risk concerns and financing capacity
- Request for qualification criteria assess technical, financial and relevant experience
- Request for proposal documents specify outputs, payment mechanisms and evaluation rules
- Bid evaluation models combine quality, price, risk and deliverability scores
- Negotiation protocols preserve competition, audit trails and approval authority
Participants can establish governance and engagement arrangements for complex urban projects.
- Stakeholder mapping identifies influence, interest, rights, concerns and engagement methods
- Community engagement plans schedule disclosure, consultation, feedback and grievance channels
- Interagency steering committees define decisions, memberships, escalation and reporting
- Project governance charters clarify sponsor, accountable owner and delegated authorities
- Gender and social inclusion analysis identifies differential access and safety impacts
- Landowner negotiations documented through transparent valuation and compensation procedures
Participants can monitor construction delivery across multiple infrastructure contracts and interfaces.
- Integrated master schedules coordinate housing works, utilities and public infrastructure
- Interface registers track design inputs, access conditions and acceptance boundaries
- Earned value management measures planned value, earned value and actual cost
- Change control procedures assess scope, cost, schedule and approval consequences
- Quality assurance plans define inspections, tests, records and nonconformance actions
- Commissioning plans sequence testing, handover, training and operational readiness
Participants can define operational performance, asset management and contract-monitoring arrangements.
- ISO 55000 principles link asset objectives, lifecycle plans and decision evidence
- Asset registers capture location, condition, criticality, ownership and replacement dates
- Service level agreements define response times, availability and customer standards
- Key performance indicators track continuity, losses, safety and complaint resolution
- Independent engineer roles verify construction, testing and operating performance
- Contract management plans govern notices, claims, payment and performance reviews
Participants can build, review and present a complete integrated urban infrastructure investment and PPP procurement proposal.
- Development brief defines target households, land use, density and service objectives
- Integrated infrastructure plan coordinates site works, trunk systems and social facilities
- Lifecycle cost model establishes capital, operating, renewal and contingency requirements
- Funding strategy combines municipal resources, developer contributions and private finance
- PPP option appraisal recommends delivery model, payment mechanism and risk allocation
- Procurement roadmap schedules approvals, market engagement, tendering and financial close
Exercises and examples are adapted to each cohort's sectors and roles.