Course modules
10 modules over 5 daysParticipants can explain how traceability and phytosanitary controls support export market access.
- Farm-to-border traceability objectives, regulatory drivers, and commercial buyer requirements
- Codex, IPPC, WTO SPS Agreement and private assurance scheme relationships
- Lot identity, product integrity, recall readiness, and market-access consequences
- Mapping fresh produce, grain, seed, and plant propagation supply chains
- Roles of producers, packhouses, exporters, NPPOs, and certification bodies
- Risk-based control points from production through inspection and release
- Traceability versus food safety, quality assurance, and sustainability claims
Participants can define traceability events, lot rules and data requirements for a commodity chain.
- One-step-back, one-step-forward traceability requirements and their operational limits
- Defining traceable resource units, lots, batches, and transformation rules
- Event data capture using who, what, when, where, and why fields
- Mass-balance reconciliation for commingling, repacking, processing, and yield loss
- Linking harvest records, input applications, inspections, and dispatch documentation
- Selecting paper registers, spreadsheets, barcodes, QR codes, and ERP interfaces
- Testing data completeness, timeliness, accuracy, and accessibility against audit criteria
Participants can prepare a traceability system design with controlled procedures and records.
- ISO 22005 traceability-system design principles for feed and food chains
- Scope statements defining products, sites, processes, customers, and intended traceability depth
- Traceability plan components: objectives, records, responsibilities, verification, and corrective action
- Document-control procedures using version numbers, approvals, retention periods, and access rights
- Standard operating procedures for lot creation, relabelling, split lots, and merges
- Record-retention schedules aligned with legal, buyer, and product-life requirements
- Internal audit trails from shipment identifiers back to source fields
Participants can interpret the roles of IPPC standards, NPPOs and exporters in phytosanitary compliance.
- IPPC purpose, National Plant Protection Organisation functions, and International Standards for Phytosanitary Measures
- ISPM 1 principles governing necessity, transparency, non-discrimination, and technical justification
- Quarantine pests, regulated non-quarantine pests, and pest-risk categories
- Pest risk analysis stages: initiation, assessment, management, and risk communication
- Importing-country requirements, bilateral protocols, and commodity-specific phytosanitary conditions
- Distinguishing phytosanitary certification from commercial quality and food-safety certification
- NPPO authority boundaries, official controls, and exporter responsibilities
Participants can assess commodity pest pathways and select proportionate risk-management measures.
- ISPM 2 pest risk analysis framework and evidence requirements
- ISPM 11 pest risk analysis for quarantine pests
- Pathway analysis linking commodity, origin, pest biology, and intended use
- Likelihood and consequence ratings using documented scoring criteria
- Risk-management options: treatments, inspection intensity, systems approaches, and prohibitions
- Evidence files combining surveillance data, scientific literature, interception records, and maps
- Communicating uncertainty, assumptions, and residual risk to technical decision-makers
Participants can specify farm and packhouse controls that prevent pest spread and preserve lot integrity.
- Good agricultural practices controlling pest introduction, spread, and contamination pathways
- Field scouting protocols, pest monitoring records, thresholds, and response triggers
- Integrated pest management decisions supported by identification and surveillance evidence
- Pre-harvest inspections, field sanitation, and segregation of suspect lots
- Packhouse hygiene, pest exclusion, cleaning verification, and cull management
- Systems approaches combining production controls, inspections, treatments, and traceability
- Corrective-action records following pest detections, nonconformities, or supplier failures
Participants can plan defensible sampling and inspection processes for export consignments.
- ISPM 31 sampling methods for lot inspection and confidence decisions
- Defining inspection units, sample sizes, acceptance criteria, and inspection frequencies
- Visual examination procedures for insects, symptoms, soil, and plant debris
- Chain-of-custody controls for diagnostic samples and laboratory submissions
- Diagnostic escalation using morphology, microscopy, serology, and molecular testing
- Recording inspection findings, photographs, sample identifiers, and disposition decisions
- Nonconforming-lot actions: hold, recondition, treat, reject, or destroy
Participants can evaluate treatment evidence and control post-treatment phytosanitary risks.
- ISPM 28 treatment standards and treatment schedule validation principles
- ISPM 15 wood packaging material requirements, marks, and compliance controls
- Cold treatment, fumigation, irradiation, and heat treatment suitability criteria
- Treatment records linking facility, schedule, sensors, lot identity, and release
- Monitoring critical parameters, calibration status, deviations, and re-treatment decisions
- Preventing post-treatment infestation through segregation, packaging, and secure transport
- Treatment-provider approval, supervision, and documentation review responsibilities
Participants can prepare and review documentation supporting phytosanitary certificate issuance.
- ISPM 12 phytosanitary certificate content, declarations, and issuance controls
- ISPM 7 export certification systems, authorization, and official oversight
- Preparing commodity descriptions, botanical names, quantities, marks, and means of conveyance
- Additional declarations linked to importing-country pest and treatment requirements
- Electronic phytosanitary certification, ePhyto concepts, and data-consistency checks
- Pre-export verification of identity, treatment evidence, inspection status, and destination conditions
- Managing amendments, replacement certificates, cancellations, and fraud indicators
Participants can test system performance, investigate failures and prioritise corrective actions.
- Mock recall methods tracing a rejected consignment from border notification
- Trace exercises measuring trace-back, trace-forward, reconciliation, and response times
- Root-cause analysis using five whys, fishbone diagrams, and evidence review
- CAPA plans assigning containment, correction, corrective action, owners, and deadlines
- Internal audit checklists for farms, packhouses, treatment providers, and exporters
- Management-review indicators: trace completion, rejection rates, audit findings, and closure
- 90-day implementation plan prioritising controls, records, training, and verification
Exercises and examples are adapted to each cohort's sectors and roles.








