Course modules
20 modules over 10 daysParticipants can distinguish inspection activities from prevention, process control and assurance activities.
- Quality assurance, quality control and inspection responsibilities compared clearly
- Inspection gates within incoming, in-process and final-release workflows
- Conformance, nonconformance, defect and failure terminology applied consistently
- Prevention, appraisal and failure costs linked to inspection choices
- Inspection independence, authority and escalation routes defined
- Customer, regulatory and contractual inspection obligations identified
Participants can convert requirements into measurable and inspectable acceptance criteria.
- Voice-of-customer requirements translated into measurable product characteristics
- Critical-to-quality characteristics identified from drawings, contracts and specifications
- Nominal values, tolerances and specification limits interpreted correctly
- Attribute characteristics distinguished from variable measurement characteristics
- Operational definitions written for observable defect conditions
- Acceptance criteria aligned with customer and regulatory requirements
Participants can explain sampling logic, population concepts and the limits of sample evidence.
- Population, lot, batch, unit and sample definitions established
- Sampling inspection compared with 100 percent inspection methods
- Inference from sample results and associated uncertainty explained
- Sampling error, bias and variability distinguished clearly
- Representative samples linked to valid lot-disposition decisions
- Inspection economics balanced against quality and customer risk
Participants can select samples that minimise selection bias and support valid conclusions.
- Simple random sampling using random-number tables and generators
- Systematic sampling intervals selected from defined lot quantities
- Stratified sampling applied to shifts, locations and suppliers
- Cluster sampling risks recognised in palletised and containerised lots
- Convenience sampling biases identified before inspection decisions
- Randomisation instructions documented within inspection work instructions
Participants can create an inspection plan linking characteristics, methods, frequency and actions.
- Inspection-plan scope defined from process flow and risk points
- Control-plan columns completed for characteristics, methods and responsibilities
- Inspection frequency set using risk, volume and process capability
- Sampling locations chosen to capture meaningful process variation
- Reaction plans specified for failed inspection results
- Inspection records designed for traceability and timely escalation
Participants can design attribute sampling plans using defect counts and acceptance numbers.
- Attribute inspection outcomes recorded as conforming or nonconforming
- Defect counts distinguished from defective-unit counts accurately
- Acceptance number and rejection number rules calculated
- Lot size and inspection level used for plan selection
- AQL interpreted as a process-quality index, not guarantee
- Operating characteristic curves introduced for attribute sampling plans
Participants can use standard attribute sampling tables to make documented lot decisions.
- ANSI/ASQ Z1.4 table structure and code letters interpreted
- ISO 2859-1 inspection levels selected for stated purposes
- Normal inspection plans selected from lot-size tables
- Single, double and multiple sampling plans compared
- AQL columns matched to defect-class acceptance requirements
- Acceptance and rejection decisions recorded from inspection findings
Participants can apply normal, tightened and reduced inspection switching rules correctly.
- Normal inspection used as the standard operating condition
- Tightened inspection triggers identified from rejected-lot history
- Reduced inspection eligibility assessed using quality performance evidence
- Switching-rule records maintained across consecutive submitted lots
- Discontinuation rules applied when quality deterioration persists
- Supplier communication linked to inspection-status changes
Participants can select variable sampling methods when measured data are available.
- Variable sampling benefits compared with attribute inspection methods
- Measured values evaluated against one-sided and two-sided specifications
- Process standard deviation estimated from representative data
- ISO 3951-1 principles applied to measurable characteristics
- Standard deviation method and unknown-variation method distinguished
- Sample results converted into lot acceptance decisions
Participants can identify when sequential or continuous sampling is appropriate for a process.
- Sequential sampling decisions updated after each inspected unit
- Wald sequential probability ratio test concepts introduced
- Continuous sampling suited to high-volume production streams
- CSP-1 clearance number and sampling fraction explained
- Inspection switching conditions defined for continuous production
- Method limitations assessed for critical safety characteristics
Participants can establish incoming inspection controls that reflect supplier and material risk.
- Supplier risk ratings used to prioritise receipt inspection
- Certificates of conformity verified against purchase-order requirements
- Receiving inspection plans linked to material criticality
- Quarantine, identification and segregation controls specified for failures
- Supplier corrective action requests triggered by recurring nonconformities
- Skip-lot inspection criteria governed by demonstrated supplier performance
Participants can coordinate sampling inspection with process monitoring and response actions.
- First-off inspection requirements established before production release
- Patrol inspection frequencies aligned with process risk and volume
- Control charts distinguished from acceptance sampling plans
- X-bar, R, p and c charts selected appropriately
- Special-cause signals escalated through defined reaction plans
- Process capability evidence used to review inspection frequency
Participants can plan final inspection that confirms release requirements and traceability.
- Final-release criteria linked to completed records and product identification
- Product audits distinguish system conformity from delivered-product conformity
- Functional, dimensional, visual and documentation checks combined
- Sampling plans applied before packaging and shipment release
- Rework and repair verification requirements defined clearly
- Release authority and certificate requirements documented
Participants can assess whether inspection measurements are suitable for acceptance decisions.
- Measurement error separated from actual product variation
- Accuracy, bias, linearity, stability and precision defined
- Repeatability and reproducibility evaluated through Gage R&R studies
- Attribute agreement analysis used for visual inspection decisions
- Calibration status checked before accepting measurement results
- Resolution requirements matched to tolerance and decision risk
Participants can establish consistent visual standards and defect-severity classifications.
- Critical, major and minor defect classes defined
- Defect catalogues built with photographs and acceptance examples
- Boundary samples used to calibrate inspector judgement
- Lighting, distance and viewing-angle conditions standardised
- Inspector certification criteria based on agreement performance
- Subjective visual criteria converted into operational definitions
Participants can analyse inspection data to identify patterns, priorities and deterioration.
- Inspection forms capture lot identity, results and disposition
- Defects per unit and percent defective calculated
- Pareto charts rank defect categories by frequency
- Run charts reveal shifts, trends and recurring variation
- Stratification separates performance by supplier, shift and product
- Traceability records support containment and root-cause investigation
Participants can control nonconforming lots through documented disposition and containment processes.
- Accepted, rejected, held and conditionally released lots distinguished
- Nonconforming material reports document evidence and disposition authority
- Containment actions prevent unintended use or shipment
- Reinspection requirements defined after sorting, rework or repair
- Concessions and deviations controlled through authorised approval
- Disposition data linked to corrective and preventive action
Participants can adjust inspection intensity according to consequence, likelihood and detection controls.
- Failure mode and effects analysis informs inspection priorities
- Severity, occurrence and detection ratings guide characteristic selection
- Producer's risk and consumer's risk balanced explicitly
- LTPD used to define unacceptable quality protection
- Inspection resources assigned to critical characteristics first
- Sampling frequency reviewed after process and supplier changes
Participants can improve inspection flow while maintaining required quality protection.
- Inspection process maps identify delays, duplication and handoffs
- Value-added inspection distinguished from avoidable checking activity
- Standard work instructions reduce variation between inspectors
- Poka-yoke controls reduce dependence on final inspection
- Inspection workload balanced against staffing and cycle-time targets
- Key performance indicators track effectiveness, cost and timeliness
Participants can build, review and present a complete sampling and inspection plan for a defined process or product.
- Process scope, product requirements and critical characteristics defined
- Inspection points mapped from receipt through final release
- Sampling method, AQL and sample-size rationale documented
- Measurement methods, defect classes and acceptance criteria specified
- Lot-disposition workflow, escalation rules and records completed
- Plan review tests traceability, feasibility and risk coverage
Exercises and examples are adapted to each cohort's sectors and roles.








