Course modules
20 modules over 10 daysParticipants can map the operating interfaces, accountabilities and performance measures within a port terminal.
- Port authority, terminal operator, agent, pilot, tug, and stevedore accountabilities
- Terminal operating model mapped across berth, yard, gate, and landside interfaces
- Common cargo flows: containers, bulk, breakbulk, Ro-Ro, and project cargo
- Service-level measures linking vessel turnaround, dwell time, and truck turn time
- Daily operating plan aligned with tide windows, berth availability, and labour
- Interface risks recorded between marine services, terminal teams, and tenants
Participants can assess capacity constraints and select actions that protect terminal flow.
- Berth occupancy ratio used to identify emerging vessel queue pressure
- Yard capacity calculated from stack density, dwell time, and usable area
- Gate flow analysis separates appointment demand, processing time, and queue length
- Bottleneck analysis identifies limiting resources across quay, yard, gate, and rail
- Shift plans match labour, equipment, cargo sequence, and forecast workload
- Operating constraints logged with trigger points and recovery actions
Participants can prepare and maintain a controlled port call plan.
- Port call sequence from notice of readiness through departure clearance
- Berth window plan balancing draft, tide, cargo readiness, and priorities
- Estimated time calculations for pilotage, mooring, cargo, and unmooring
- Port call message controls using ETA updates, milestones, and exception flags
- Readiness checklist covering documentation, gang allocation, equipment, and safety controls
- Delay codes distinguishing weather, berth, labour, equipment, and documentation causes
Participants can structure terminal safety controls around accountable management system elements.
- Safety management system elements aligned with ISM Code responsibilities and records
- Policy, procedures, permits, inspections, and corrective actions linked through control
- Safety leadership behaviours that stop unsafe work without disrupting escalation routes
- Document hierarchy distinguishing policies, plans, procedures, checklists, and task instructions
- Management-of-change trigger assessment before altered cargo, equipment, or operating conditions
- Terminal safety action plan structured around accountable owners and due dates
Participants can identify major operational hazards and verify the controls that prevent serious events.
- Task risk assessment using hazard identification, exposure assessment, and control selection
- Bow-tie analysis connecting threats, preventive barriers, consequences, and recovery barriers
- Risk matrix calibration using credible likelihood definitions and consequence criteria
- Critical controls verified through field observations, records, and supervisor questioning
- Dynamic risk assessment applied when weather, access, equipment, or cargo changes
- Risk register entries written with owners, deadlines, residual ratings, and evidence
Participants can establish permit and isolation arrangements for high-risk terminal work.
- Permit-to-work boundaries for hot work, confined spaces, electrical isolation, and lifting
- Isolation plans using lockout-tagout points, test-for-dead verification, and handback controls
- Confined-space entry controls covering atmosphere tests, attendants, rescue, and communications
- Hot-work fire watch requirements, gas testing, combustibles removal, and post-work monitoring
- Simultaneous operations review identifying incompatible tasks, shared hazards, and communication controls
- Permit audits checking authorisation, validity periods, site conditions, and closeout
Participants can control the operational and safety interface between vessel and terminal.
- Ship-shore safety meeting agenda covering moorings, access, cargo, and emergency signals
- Mooring line hazards assessed around snap-back zones, bights, and line condition
- Safe gangway arrangements verified for angle, netting, lighting, and landing
- Pilotage and towage interfaces controlled through passage plans and communications
- Vessel loading limits checked against stability information, draft, and berth restrictions
- Master-terminal communication protocol documents stoppage authority and changing conditions
Participants can plan cargo handling sequences and control the main cargo transfer risks.
- Cargo handling sequence planned from discharge order through tally and handover
- Container terminal moves coordinated between quay cranes, transport, stacks, and gates
- Bulk cargo dust, spillage, moisture, and segregation controls specified
- Breakbulk lifting plans address slinging, centre of gravity, and exclusion zones
- Ro-Ro ramp operations control vehicle movements, lashings, and pedestrian separation
- Cargo damage reports preserve evidence, condition details, and notification times
Participants can apply dangerous goods and bulk cargo controls to terminal acceptance and handling.
- IMDG Code classification, documentation, placarding, segregation, and emergency information
- Container dangerous goods declarations checked against packing certificates and stowage data
- Segregation plans separate incompatible substances across vessel, yard, and warehouse locations
- Damaged package response isolates hazards, protects personnel, and preserves manifest details
- Bulk cargo acceptance checks verify declared properties, moisture, and handling constraints
- Cargo incident controls coordinate terminal, vessel, emergency services, and authorities
Participants can design traffic and yard controls that reduce conflict and congestion.
- Yard zoning separates pedestrians, mobile plant, trucks, rail, and storage areas
- Traffic management plan sets routes, speed limits, crossings, and reversing controls
- Stacking rules account for ground bearing, height limits, segregation, and access
- Gate appointment data used to smooth arrivals and reduce roadside queues
- Housekeeping inspections identify loose dunnage, spills, obstructions, and damaged surfaces
- Night operations controls address illumination, fatigue, visibility, and communication
Participants can prioritise equipment controls that protect people and terminal availability.
- Planned maintenance schedule prioritises safety-critical cranes, brakes, alarms, and interlocks
- Pre-use inspections record defects, equipment status, isolation, and release decisions
- Crane lift planning defines load weight, radius, rigging, capacity, and exclusions
- Preventive maintenance backlog analysed by criticality, failure mode, and downtime impact
- Competence authorisations link operators to equipment types and operating limits
- Defect escalation process prevents use beyond approved temporary control periods
Participants can prepare response arrangements for credible terminal emergency scenarios.
- Emergency response plan assigns command, communications, evacuation, and external liaison roles
- Fire scenarios address fuel sources, alarm escalation, access, and firefighting resources
- Spill response establishes source control, containment, recovery, and waste disposal
- Man-overboard response coordinates alarms, rescue equipment, vessels, and medical support
- Severe weather triggers protect cranes, vessels, stacks, personnel, and access
- Tabletop scenario records decisions, communications, injects, and corrective actions
Participants can apply port facility security requirements to daily terminal access and operations.
- ISPS Code responsibilities distinguish port facility, vessel, and authority duties
- Port facility security plan controls access points, restricted areas, and patrols
- Security levels translate into escalating screening, identification, and visitor controls
- Declaration of Security use clarified for heightened threat or interface concerns
- Cargo tampering indicators reported through evidence preservation and notification protocols
- Cyber access controls protect terminal operating systems, credentials, and remote connections
Participants can apply environmental controls to routine terminal activity and environmental incidents.
- MARPOL discharge restrictions applied to wastes, residues, bilge, and sewage reception
- Environmental aspects register covers emissions, noise, dust, water, waste, and biodiversity
- Fuel transfer controls prevent overfill, hose failure, drainage contamination, and ignition
- Stormwater inspection points identify contaminated runoff, silt, debris, and sheen
- Waste segregation arrangements document storage, collection, transfer, and contractor records
- Environmental incident report captures source, pathway, impact, notifications, and recovery
Participants can use operational and safety measures to identify performance deterioration and assign recovery actions.
- Terminal dashboard links vessel turnaround, berth productivity, dwell, gate, and incidents
- Berth occupancy calculation tests capacity pressure against planned vessel arrivals
- Crane productivity measures distinguish gross moves, net moves, delays, and availability
- Safety leading indicators track inspections, critical-control checks, reports, and closeouts
- Control charts separate common-cause variation from special-cause operational disruption
- Daily operations meeting uses escalation thresholds, owners, and recovery actions
Participants can investigate terminal incidents and produce corrective actions that address underlying causes.
- Initial incident response secures people, scene, evidence, witnesses, and notifications
- Fact-finding interview technique separates observation, inference, assumption, and allegation
- Timeline analysis reconstructs conditions, decisions, barriers, and deviations before an event
- Causal analysis tests equipment, procedures, supervision, competence, and organisational factors
- Corrective action quality checked for control strength, ownership, deadlines, and verification
- Lessons learned brief converts findings into changed standards and field checks
Participants can define and monitor safety responsibilities for contractors and terminal tenants.
- Contractor prequalification reviews competence, insurance, equipment, safety performance, and supervision
- Scope-of-work boundaries allocate controls between terminal, contractor, vessel, and tenant
- Induction content addresses local rules, emergency actions, permits, and reporting
- Supervisor coordination meetings resolve schedule clashes, access constraints, and shared risks
- Contractor performance scorecard tracks observations, incidents, corrective actions, and attendance
- Tenant compliance inspections address storage, traffic, waste, access, and housekeeping
Participants can prepare recovery arrangements for terminal disruptions that affect critical operations.
- Operational disruption scenarios cover berth closure, crane failure, cyber outage, and weather
- Business continuity priorities protect life, vessel safety, cargo integrity, and critical services
- Recovery time objectives set restoration targets for gates, systems, equipment, and utilities
- Alternative berth and yard plans manage displaced vessels, cargo, and trucks
- Stakeholder communications matrix assigns messages, channels, approvals, and update frequency
- After-action reviews convert disruptions into tested recovery improvements and investments
Participants can assess control effectiveness and prepare evidence-based improvement priorities for management.
- Internal audit plan samples permits, inspections, maintenance, training, and emergency readiness
- Audit evidence evaluated against procedures, legal duties, records, and observed conditions
- Nonconformity statements identify requirement, evidence, gap, risk, and responsible owner
- Corrective action follow-up verifies completion, effectiveness, and recurrence prevention
- Management review pack combines trends, significant risks, resources, and decisions
- 90-day improvement roadmap sequences quick fixes, control upgrades, and assurance checks
Participants can build, review and present a complete terminal operations and safety dossier for a defined operating scenario.
- Terminal operations and safety dossier defines scope, interfaces, constraints, and assumptions
- Port call plan integrates berth allocation, readiness milestones, and communications
- Risk register and bow-tie controls address priority operational hazards
- Permit, traffic, cargo, emergency, security, and environmental controls form implementation plan
- Performance dashboard sets measures, thresholds, review rhythm, and accountable owners
- Peer review tests feasibility, control gaps, escalation routes, and evidence quality
- Formal presentation defends priorities, resources, residual risk, and improvement schedule
Exercises and examples are adapted to each cohort's sectors and roles.








