Course modules
16 modules over 10 daysParticipants can define a strategically relevant improvement opportunity with clear scope, ownership and success measures.
- Operational value streams linked to customer outcomes, cost, quality and speed
- Strategic alignment using Hoshin Kanri catchball and measurable breakthrough objectives
- Process improvement charters defining problem, scope, sponsor, team and constraints
- Customer and stakeholder requirements translated into critical-to-quality measures
- Baseline performance established from demand, capacity, lead time and defect data
- Improvement portfolios balanced between quick wins, projects and strategic innovation
Participants can convert customer evidence into measurable requirements for process and service design.
- Voice of the Customer sources: complaints, interviews, surveys and observation
- Kano model distinguishes basic, performance and attractive service requirements
- Customer journey maps expose friction, uncertainty, waiting and repeated contact
- Translating needs into measurable service specifications and acceptance criteria
- Quality function deployment links customer priorities with process design choices
- Segmentation separates materially different customer needs, volumes and service paths
Participants can define process boundaries, suppliers, inputs, outputs and customers before detailed analysis.
- Process architecture distinguishes value streams, core processes and supporting processes
- SIPOC diagrams establish suppliers, inputs, process boundaries, outputs and customers
- Start and end points prevent scope drift during improvement projects
- Interfaces reveal dependencies between functions, systems, vendors and control owners
- Process ownership assigned through accountable roles and decision rights
- High-level process measures distinguish effectiveness, efficiency, quality and compliance
Participants can create current-state maps that expose work flow, decisions, delays and rework.
- Swimlane maps show activities, hand-offs, decisions, roles and system interactions
- BPMN symbols distinguish events, tasks, gateways, messages and subprocesses
- Gemba observation records actual work rather than documented procedures
- Process walk-throughs identify informal workarounds, queues and duplicate entry
- Cycle time, wait time and touch time measured consistently
- Rework loops and exception paths quantified within the current-state map
Participants can establish reliable measures and a data collection plan for process improvement.
- Operational definitions specify exactly how each performance measure is calculated
- Data collection plans identify source, owner, frequency, sample and verification
- Leading and lagging indicators linked through a practical measurement tree
- Run charts reveal shifts, trends, cycles and unusual process variation
- Stratification separates results by channel, product, team, customer and location
- Data-quality checks test completeness, accuracy, timeliness and consistent coding
Participants can identify non-value-adding work and improve flow through a process.
- TIMWOODS categories identify transport, inventory, motion, waiting and defects
- Value-added analysis separates customer value, business necessity and waste
- Little's Law connects work-in-progress, throughput and lead time
- Bottleneck analysis compares demand, capacity, utilisation and queue formation
- Takt time translates customer demand into required production or service pace
- Spaghetti diagrams expose excessive movement, travel and physical layout constraints
Participants can distinguish symptoms from validated causes and select appropriate corrective actions.
- Problem statements describe deviation, location, timing, scale and customer effect
- Five Whys traces causal chains beyond immediate operational symptoms
- Fishbone diagrams organise potential causes under people, process, technology and policy
- Cause-and-effect matrices prioritise inputs with strongest effects on outcomes
- Is-is not analysis sharpens the boundaries of a recurring problem
- Evidence tests confirm causes before teams commit resources to corrective actions
Participants can select improvement actions using benefit, effort, risk and implementation criteria.
- Pareto charts focus attention on the few causes driving most losses
- Impact-effort matrices compare candidate actions before detailed project planning
- Cost of poor quality includes failures, rework, concessions and customer recovery
- Benefit hypotheses state expected gains, assumptions, owners and measurement methods
- RACI matrices clarify decision authority, delivery responsibilities and consultation requirements
- Stage-gate reviews test readiness before funding, piloting or scaling changes
Participants can generate, screen and develop practical innovation concepts for operational challenges.
- Design thinking frames operational problems through user needs and observed behaviour
- How Might We questions convert constraints into focused innovation prompts
- Brainwriting produces diverse ideas before group discussion influences contributions
- SCAMPER challenges existing services, policies, workflows and customer interactions
- Idea screening scores desirability, feasibility, viability, risk and strategic fit
- Concept sheets document target users, value proposition, assumptions and test criteria
Participants can redesign a process to improve flow, quality, control and customer value.
- Future-state maps remove non-value-adding steps and simplify decision paths
- Pull systems trigger work from demand rather than forecasts or batch schedules
- Standard work defines sequence, timing, quality checks and expected outputs
- Workload balancing redistributes tasks to reduce bottlenecks and unevenness
- Service blueprints align front-stage interactions with supporting operational activities
- Business rules reduce discretionary decisions and inconsistent process execution
Participants can build preventive controls that reduce defects before they reach customers.
- Poka-yoke methods prevent errors, detect deviations and prompt immediate correction
- Checklists support reliable execution of high-risk, infrequent or complex tasks
- First-time-right measures reveal quality losses hidden within output volumes
- Control points placed where defects can be prevented or contained earliest
- Visual management makes status, standards, abnormalities and priorities visible
- Acceptance criteria define conditions for complete, accurate and compliant outputs
Participants can assess process failure risks and prioritise preventive control actions.
- Failure Mode and Effects Analysis identifies failure modes and consequences
- Severity ratings assess customer, regulatory, safety and financial impact
- Occurrence ratings estimate likelihood using evidence, history and process conditions
- Detection ratings evaluate whether existing controls identify failures in time
- Risk priority scoring ranks preventive actions and accountable control owners
- Residual-risk reviews confirm control effectiveness after improvement implementation
Participants can test process changes on an appropriate scale before wider implementation.
- PDCA cycles structure planning, testing, review and standardisation of changes
- Pilot charters define target population, duration, measures, controls and exit criteria
- Hypothesis statements connect proposed changes with expected measurable outcomes
- A/B comparisons distinguish intervention effects from normal process variation
- Pilot feedback captures employee usability, customer response and unforeseen consequences
- Decision criteria determine whether to adopt, adapt, extend or stop changes
Participants can plan implementation activities that secure adoption and protect service performance.
- Stakeholder analysis identifies influence, impact, concerns and engagement actions
- Change-impact assessments compare current roles, systems, controls and behaviours
- Implementation roadmaps sequence pilots, dependencies, communications and readiness activities
- Training needs analysis defines affected groups, competencies and support materials
- Resistance diagnostics distinguish capability gaps, incentives, workload and trust issues
- Issue logs assign owners, due dates, escalation routes and closure evidence
Participants can sustain process gains through controls, ownership and benefits tracking.
- Control plans specify measures, limits, review frequency, owners and response actions
- Standard operating procedures document approved workflow, controls and exceptions
- Statistical process control distinguishes common-cause and special-cause variation
- Benefits-realisation registers track savings, service gains, costs and assumptions
- Daily management boards connect frontline performance with corrective action routines
- Audit trails provide evidence that redesigned controls operate as intended
Participants can build, review and present a complete evidence-based process improvement and innovation proposal.
- Improvement charter consolidates business problem, scope, measures, stakeholders and benefits
- Current-state evidence combines process maps, baseline data and customer insights
- Root-cause assessment links verified causes with prioritised improvement opportunities
- Future-state design specifies flow changes, controls, technology and operating roles
- Implementation plan defines pilots, milestones, risks, resources and governance
- Executive presentation communicates recommendation, economics, assumptions and control plan
Exercises and examples are adapted to each cohort's sectors and roles.








