Course modules
19 modules over 10 daysParticipants can define a hydrological survey scope, evidence requirements and assessment workflow.
- Hydrological survey purposes for flood studies, water supply, and drainage design
- Catchment boundaries, flow paths, and control points interpreted from terrain
- River basin terminology: watershed, reach, thalweg, bankfull stage, and floodplain
- Data requirements defined for discharge, rainfall, groundwater, sediment, and water quality
- Survey specifications aligned with project objectives, uncertainty, and reporting needs
- Field-to-model workflow mapped from reconnaissance through validated assessment outputs
Participants can prepare spatial data for hydrological mapping and analysis.
- Projected and geographic coordinate reference systems selected for catchment mapping
- Datum transformations checked before combining survey, satellite, and engineering datasets
- Hydrographic base maps assembled from contours, rivers, roads, and administrative boundaries
- Raster and vector data structures matched to hydrological analysis requirements
- Metadata reviewed for source, resolution, date, accuracy, and usage constraints
- Map scale and positional accuracy assessed against survey design tolerances
Participants can delineate a catchment and drainage network from elevation data.
- Digital elevation models inspected for voids, artefacts, sinks, and resolution limitations
- Depression filling and breaching methods applied before flow-direction processing
- D8 flow-direction grids generated from conditioned elevation surfaces
- Flow accumulation thresholds selected using mapped channels and imagery evidence
- Watershed boundaries derived upstream from gauging stations and design locations
- Terrain-derived drainage networks compared with mapped hydrography and field observations
Participants can interpret remote-sensing data to support hydrological survey decisions.
- Satellite imagery interpreted for channels, wetlands, drainage obstructions, and land cover
- Normalized Difference Vegetation Index used to identify seasonal vegetation patterns
- Synthetic aperture radar imagery assessed for floodwater detection beneath cloud cover
- Multitemporal imagery compared to identify channel migration and inundation extent
- Land-cover classifications checked against field photographs and local knowledge
- Image resolution and acquisition date evaluated before hydrological interpretation
Participants can prepare a safe, targeted field plan for hydrological data collection.
- Reconnaissance routes planned around access, hazards, permissions, and representative locations
- Gauging sections selected for stable controls, safe access, and measurable velocities
- Survey equipment lists prepared for stage, velocity, geometry, and water-quality observations
- Chain-of-custody records established for samples, photographs, and field documentation
- Field forms structured for repeatable observations, coordinates, timestamps, and anomalies
- Risk assessments address swift water, weather, terrain, wildlife, and communications
Participants can survey channel geometry and identify controls affecting flow measurements.
- Cross sections surveyed using stations, offsets, elevations, and defined bank points
- Longitudinal profiles recorded to identify slope breaks, controls, and backwater effects
- Natural controls assessed at riffles, rock outcrops, constrictions, and channel bends
- Artificial controls documented at weirs, culverts, bridges, gates, and outfalls
- Bankfull indicators identified from vegetation lines, deposits, scour, and channel form
- Manning roughness observations recorded for later hydraulic interpretation and modelling
Participants can calculate discharge from field measurements using suitable velocity-area methods.
- Velocity-area discharge measurements planned across representative verticals and channel widths
- Current-meter observations converted into mean vertical velocities using accepted coefficients
- Acoustic Doppler current profiler data reviewed for transect consistency and invalid cells
- Float gauging applied where instruments are unavailable and uncertainty is documented
- Wading, cableway, bridge, and boat measurements selected using site conditions
- Discharge calculations checked through area, velocity, unit conversion, and closure tests
Participants can develop and assess a stage-discharge rating curve for a gauging site.
- Staff gauges, pressure transducers, and dataloggers compared for stage monitoring
- Gauge datum established against stable benchmarks and documented reference levels
- Stage-discharge pairs plotted on arithmetic and logarithmic graph scales
- Rating curves fitted using segmented controls, extrapolation limits, and residual checks
- Shifting controls identified from sediment deposition, vegetation, scour, and debris
- Rating uncertainty communicated through confidence bands, notes, and validation measurements
Participants can prepare rainfall records and design storm inputs for hydrological assessment.
- Rain-gauge records screened for missing values, outliers, timing errors, and duplicates
- Thiessen polygons and inverse-distance weighting used for areal rainfall estimation
- Intensity-duration-frequency curves interpreted for selected return periods and durations
- Design storm hyetographs built using alternating-block and temporal-pattern methods
- Antecedent moisture conditions considered when selecting event-based runoff inputs
- Radar rainfall estimates compared with gauge observations before model application
Participants can analyse streamflow records and extract hydrological response characteristics.
- Hydrographs separated into baseflow and direct runoff using graphical methods
- Peak flow, lag time, runoff volume, and recession constants calculated
- Double-mass curves used to identify rainfall and streamflow record inconsistencies
- Flow-duration curves developed for water-resource and ecological flow assessment
- Seasonal flow patterns examined using monthly statistics and hydrograph comparisons
- Data gaps treated using documented interpolation, correlation, or exclusion decisions
Participants can estimate design flows from observed records using frequency-analysis methods.
- Annual maximum and peaks-over-threshold series selected for flood-frequency analysis
- Gumbel and Log-Pearson Type III distributions fitted to peak-flow records
- Return periods interpreted without confusing probability, recurrence, and event timing
- Plotting positions used to compare observed peaks with fitted distributions
- Short-record limitations assessed using regional evidence, uncertainty, and sensitivity tests
- Design discharges documented with record length, assumptions, and confidence ranges
Participants can build a basic rainfall-runoff model and interpret simulated hydrographs.
- Model structure defined through subcatchments, reaches, losses, transforms, and routing
- SCS Curve Number method applied using soils, land cover, and antecedent conditions
- Unit hydrograph parameters estimated from catchment area, slope, and travel time
- Muskingum routing used to represent attenuation through river reaches
- Calibration compares simulated and observed hydrographs using peak, volume, and timing
- Sensitivity analysis identifies parameters that materially affect design-flow estimates
Participants can assess runoff and drainage performance in developed catchments.
- Rational Method peak flows estimated from intensity, area, and runoff coefficient
- Imperviousness mapped from imagery, parcel data, roads, and roof footprints
- Drainage networks traced through inlets, pipes, culverts, channels, and outfalls
- Time of concentration estimated using overland, gutter, pipe, and channel segments
- Stormwater storage assessed through ponds, basins, wetlands, and detention structures
- Blockage and surcharge risks identified from field observations and drainage connectivity
Participants can assess groundwater indicators and their relationship to surface-water flow.
- Groundwater conceptual models distinguish recharge, storage, discharge, and abstraction zones
- Piezometric levels mapped to infer hydraulic gradients and groundwater flow directions
- Spring inventories record location, discharge, seasonality, geology, and water uses
- Baseflow index estimated from streamflow records using separation techniques
- Well logs interpreted for aquifer materials, screened intervals, and static water levels
- Surface-water groundwater interactions assessed near wetlands, rivers, and abstractions
Participants can integrate sediment and water-quality observations into hydrological assessments.
- Suspended sediment sampling planned around storm events, baseflow, and seasonal conditions
- Turbidity, conductivity, pH, temperature, and dissolved oxygen measured with field meters
- Erosion sources identified from bank failures, gullies, construction sites, and roads
- Sediment deposition mapped at channel bends, reservoirs, culverts, and floodplain margins
- Grab samples preserved, labelled, stored, and transferred using documented protocols
- Water-quality results interpreted against project objectives, baseline conditions, and trends
Participants can produce flood-exposure maps from terrain, water-level and asset data.
- Flood extent mapped from surveyed levels, satellite observations, and terrain surfaces
- Hand, terrain, and connectivity checks applied to remove implausible inundation areas
- Buildings, roads, utilities, farmland, and critical facilities intersected with flood zones
- Depth grids classified into meaningful bands for damage and access assessment
- Evacuation routes evaluated against crossing points, low spots, and inundation timing
- Flood maps annotated with datum, scenario, assumptions, limitations, and source dates
Participants can evaluate uncertainty and apply quality controls throughout a hydrological study.
- Measurement uncertainty estimated for stage, velocity, area, rainfall, and elevation data
- Error propagation applied to discharge calculations and derived hydrological variables
- Quality assurance plans define checks, approvals, corrections, and version control
- Field-data validation compares duplicate readings, photographs, logs, and expected ranges
- Model assumptions recorded in an auditable register with evidence and limitations
- Spatial data governance addresses naming conventions, metadata, backups, and access permissions
Participants can prepare clear technical outputs that support engineering and planning decisions.
- Report structures distinguish methods, results, interpretation, limitations, and recommendations
- Catchment maps designed with legible symbology, scale bars, north arrows, and sources
- Tables present gauging results, rainfall inputs, model parameters, and design flows
- Assumptions and uncertainty stated plainly without overstating confidence in results
- Technical findings translated into implications for design, operations, and risk controls
- Peer review checks traceability from raw observations to final conclusions
Participants can build, review and present a complete hydrological survey and assessment for a defined project site.
- Project brief translated into survey objectives, decisions, constraints, and acceptance criteria
- Catchment model assembled from terrain, hydrography, land cover, and field evidence
- Survey plan specifies sites, methods, equipment, safety controls, and quality checks
- Rainfall, discharge, and stage datasets analysed for design-flow and flood assessment
- Flood exposure outputs linked to infrastructure, communities, access routes, and assets
- Technical report and map pack presented for peer review and decision feedback
Exercises and examples are adapted to each cohort's sectors and roles.








