Course modules
20 modules over 10 daysParticipants can frame a natural resource decision as a spatial analysis question with defined users, criteria and outputs.
- Natural resource decisions translated into spatial questions, criteria and evidence requirements
- Decision chains linking resource conditions, pressures, interventions and measurable outcomes
- Stakeholder mapping for agencies, communities, concession holders and technical reviewers
- Problem statements separating management objectives from available spatial datasets
- Scale, extent and time period selected for defensible analysis
- Conceptual models documenting drivers, pressures, state, impacts and responses
Participants can select, assign and verify coordinate reference systems appropriate to resource analysis.
- Geographic and projected coordinate systems compared for environmental mapping purposes
- Datum transformations identified when combining GPS, survey and legacy datasets
- UTM zone selection for watershed, forest and protected-area analysis
- Projection distortion assessed for area, distance, direction and shape measurements
- Coordinate reference metadata checked before overlaying layers from multiple sources
- Reprojection workflows preserving geometry, attribute integrity and documented source lineage
Participants can build a geodatabase structure that supports natural resource monitoring and analysis.
- Feature classes designed for sites, boundaries, observations and management units
- Attribute domains standardising land cover, condition classes and intervention types
- Unique identifiers linking field observations, photographs and laboratory results
- Relationship classes connecting monitoring events to locations and survey teams
- Topology rules preventing overlaps, gaps and invalid shared boundaries
- Naming conventions supporting version control, handover and audit trails
Participants can specify field data collection methods that produce usable GIS records.
- Sampling designs matched to habitat, water-quality and land-condition monitoring objectives
- Point, line and polygon observations selected for resource feature geometry
- Field forms structured with mandatory attributes, coded values and validation rules
- GNSS accuracy requirements matched to asset, boundary and ecological survey needs
- Photographs, timestamps and observer records linked to spatial observation identifiers
- Field protocols addressing access constraints, safety and sensitive-location confidentiality
Participants can evaluate dataset fitness for use and document limitations for downstream users.
- ISO 19115-1 metadata elements recorded for source, lineage and distribution
- Positional accuracy assessed against survey control points and imagery references
- Attribute completeness checks identifying missing classes, codes and observation dates
- Temporal validity reviewed against seasonal conditions and management reporting periods
- Logical consistency tests applied to topology, domains and classification rules
- Fitness-for-purpose statements connecting data limitations to decision risk
Participants can use vector geoprocessing tools to measure spatial relationships and management exposure.
- Buffer distances applied around rivers, wells, roads and protected habitats
- Overlay operations comparing concessions, tenure parcels and conservation priorities
- Proximity analysis locating communities, infrastructure and pressure sources near resources
- Dissolve and multipart tools summarising management zones by common attributes
- Spatial joins aggregating incidents, surveys and resource observations by administrative unit
- Area and length calculations performed using appropriate projected coordinate systems
Participants can prepare raster datasets for environmental modelling and resource condition assessment.
- Raster resolution selected according to process scale and decision precision
- Cell size, extent and alignment controlled before combining raster datasets
- NoData values distinguished from zero values and valid absence records
- Raster reclassification converting continuous measures into management-relevant categories
- Resampling methods compared for categorical land cover and continuous elevation surfaces
- Raster calculator expressions combining condition, pressure and accessibility variables
Participants can derive terrain and drainage indicators for watershed and erosion management decisions.
- Digital elevation models checked for sinks, artefacts and vertical-unit consistency
- Slope, aspect and curvature derived for land-condition and erosion assessments
- Flow direction and accumulation calculated from hydrologically conditioned elevation models
- Watershed boundaries delineated from pour points and drainage networks
- Stream-order classification applied using the Strahler stream-order method
- Topographic wetness index interpreted for runoff concentration and saturation risk
Participants can select and prepare satellite imagery for resource monitoring questions.
- Landsat and Sentinel-2 imagery compared for spatial, spectral and temporal resolution
- Cloud masking and scene selection matched to seasonal monitoring objectives
- Spectral bands interpreted for vegetation, water, bare soil and built surfaces
- Normalized Difference Vegetation Index calculated for vegetation condition screening
- False-colour composites prepared to distinguish vegetation stress and surface moisture
- Image preprocessing documented with acquisition date, processing level and cloud cover
Participants can classify land cover and report classification accuracy using accepted measures.
- Training samples selected using representative land-cover reference observations
- Supervised classification performed with maximum likelihood and random forest methods
- Class definitions aligned with project objectives and field-observable categories
- Confusion matrices calculated from independent validation sample points
- Producer's, user's and overall accuracy reported with classification limitations
- Post-classification smoothing applied without obscuring small, important features
Participants can quantify resource change between dates and establish a repeatable monitoring approach.
- Image dates selected to control seasonal variation and phenological effects
- Post-classification comparison quantifying transitions between land-cover categories
- Change matrices identifying deforestation, restoration, conversion and stable areas
- NDVI differencing used to screen vegetation decline and recovery patterns
- Minimum mapping units defined for reporting meaningful spatial change
- Monitoring baselines, indicators and update frequencies documented for programme reporting
Participants can build and test a transparent suitability model for a resource management intervention.
- Management objectives translated into factors, constraints and exclusion areas
- Criteria standardisation converts diverse measures into comparable suitability scales
- Weighted overlay combines ecological, social, technical and cost criteria
- Analytic Hierarchy Process supports pairwise comparison of criterion importance
- Constraint masks exclude legally restricted, unsafe or technically unsuitable locations
- Sensitivity analysis tests how weight changes affect priority areas
Participants can identify priority conservation areas and assess landscape connectivity using spatial indicators.
- Habitat patches measured for area, edge exposure and shape complexity
- Core-area analysis distinguishes interior habitat from edge-affected land
- Least-cost paths model movement routes between habitat patches
- Resistance surfaces assign movement costs across land-cover and infrastructure classes
- Corridor alternatives compared against tenure, settlements and planned development
- Priority sites ranked using biodiversity value, threat level and feasibility
Participants can analyse catchment pressures and identify geographically targeted water-resource actions.
- Riparian buffer zones mapped against agriculture, settlement and infrastructure encroachment
- Upstream-downstream relationships analysed using sub-catchment boundaries and flow paths
- Erosion susceptibility mapped from slope, cover, soils and rainfall proxies
- Water-point inventories assessed for service areas, condition and seasonal reliability
- Pollution-source screening combines drainage networks, facilities and incident locations
- Catchment intervention zones prioritised using risk, beneficiaries and implementation feasibility
Participants can map resource condition and target restoration measures for terrestrial landscapes.
- Forest inventory plots linked to stands, compartments and management prescriptions
- Canopy-cover indicators mapped from imagery and field verification records
- Rangeland condition classes defined using vegetation, bare ground and grazing pressure
- Restoration opportunity areas screened for degradation, tenure and access constraints
- Fire-risk surfaces combine fuel load, slope, roads and settlement proximity
- Management zones assigned for protection, recovery, sustainable use and monitoring
Participants can integrate climate hazards, exposure and ecosystem functions into spatial adaptation planning.
- Hazard, exposure and vulnerability layers structured for climate-risk assessment
- Flood exposure mapped using terrain, drainage, settlement and infrastructure data
- Heat-risk screening combines land surface temperature, tree cover and population
- Ecosystem services mapped for flood regulation, erosion control and cooling
- Nature-based adaptation sites prioritised using benefit, feasibility and maintenance criteria
- Uncertainty communicated where climate projections and local data disagree
Participants can produce clear maps and supporting narratives for technical and management decisions.
- Map purpose determines projection, scale, symbology and level of detail
- Visual hierarchy directs attention to findings, priorities and management boundaries
- Classification methods selected for ordinal, nominal and continuous environmental data
- Colour schemes distinguish risk, condition, change and protected-status categories
- Layout elements include scale bar, north arrow, sources and coordinate grid
- Technical notes state methods, assumptions, limitations and recommended actions
Participants can manage spatial data responsibly under environmental, legal and community safeguards.
- Data governance roles assign ownership, stewardship, approval and publication responsibilities
- Access controls protect species locations, cultural sites and personal information
- Free, Prior and Informed Consent considered for community-derived spatial data
- Data-sharing agreements define permitted uses, attribution and redistribution conditions
- Version control records edits, approvals and superseded analytical outputs
- Ethical map review checks potential harm from disclosure or misinterpretation
Participants can plan a maintainable GIS workflow for routine natural resource monitoring and reporting.
- Standard operating procedures define acquisition, validation, analysis and publication steps
- Workflow diagrams identify inputs, transformations, outputs and accountable roles
- Quality assurance checkpoints placed before analysis, review and external release
- Update schedules align field surveys, imagery acquisition and reporting deadlines
- Resource plans specify software, storage, staff capability and field equipment needs
- Implementation roadmaps sequence pilots, validation, rollout and performance review
Participants can build, review and present a complete GIS-based natural resource management decision product with documented methods and recommendations.
- Project brief defines decision owner, resource issue, users and acceptance criteria
- Geodatabase integrates authoritative layers, field observations and derived analysis outputs
- Analysis workflow applies quality checks, spatial methods and stated assumptions
- Suitability or risk model produces prioritised areas for management action
- Map series communicates baseline conditions, findings, uncertainty and recommended interventions
- Peer review tests reproducibility, evidence quality and decision relevance
- Decision brief presents implementation priorities, limitations and monitoring indicators
Exercises and examples are adapted to each cohort's sectors and roles.








