Course modules
20 modules over 10 daysParticipants can distinguish the records, legal concepts and custodial roles that shape a parcel GIS.
- Cadastre, land registry and valuation records distinguished by legal purpose
- Parcel lifecycle mapped from subdivision application through registration and maintenance
- ISO 19152 LADM classes related to local cadastral legislation
- Rights, restrictions and responsibilities modelled against parcels and parties
- Authoritative data custodians identified for boundaries, addresses and infrastructure
- Metadata records capture source, date, scale, lineage and legal status
Participants can select, document and test coordinate reference systems for parcel and infrastructure data.
- Geographic, projected and local engineering coordinate reference systems compared
- EPSG codes selected from jurisdiction, survey control and accuracy requirements
- Datum transformations evaluated using published parameters and residual errors
- Survey plans georeferenced with control points, RMS error and transformation reports
- Vertical datums and geoid models applied to infrastructure elevation data
- Coordinate reference metadata documented for exchange and future maintenance
Participants can translate land administration rules into a usable GIS data model.
- Parcel polygons, boundary lines and survey points structured as feature classes
- Unique parcel identifiers designed for subdivision, merger and retirement events
- Domain values and subtypes control land-use and tenure attributes
- Relationship classes link parcels, owners, documents and valuation records
- Logical data models translate business rules into GIS schemas
- Field names, aliases and null rules support controlled editing
Participants can assess, reconcile and document land information from multiple source systems.
- Title plans, survey records and orthophotos assessed for positional fitness
- Source registers record custodian, licence, currency, scale and legal authority
- ETL mappings reconcile identifiers between registry, billing and GIS systems
- Data conflation rules resolve duplicate roads, addresses and parcel edges
- Raster and vector inputs prepared using documented import procedures
- Acceptance criteria separate reference layers from authoritative boundary evidence
Participants can create a parcel dataset using repeatable digitising and attribution procedures.
- QGIS and ArcGIS Pro projects configured with standard folder structures
- Parcel features created from bearings, distances, coordinates and surveyed monuments
- Subdivision plans digitised using snapping, tracing and construction tools
- Editing templates apply coded values, defaults and mandatory attributes
- Feature creation logs record editor, source document and effective date
- First parcel dataset assembled for a defined municipal study area
Participants can detect, correct and document geometric errors in a parcel fabric.
- Topology rules detect gaps, overlaps, slivers and unclosed parcel boundaries
- Must Not Overlap and Must Not Have Gaps rules configured
- Cluster tolerance selected without displacing legally surveyed boundary positions
- Error exceptions documented where shared geometry reflects valid conditions
- Topology validation reports prioritise corrections by legal and operational risk
- Clean parcel fabrics published as controlled edit-ready reference layers
Participants can evaluate parcel data quality and issue evidence-based correction reports.
- Attribute completeness measured against mandatory fields and domain conformance
- Positional accuracy tested using independent checkpoints and RMSE statistics
- Logical consistency checks identify invalid dates, identifiers and relationships
- ISO 19157 quality elements applied to parcel dataset assessment
- Sampling plans distinguish full inspection from risk-based quality review
- Quality reports record defects, severity, corrective actions and sign-off
Participants can process parcel changes while preserving survey evidence and historical records.
- Parcel fabric records connect plans, parcels, lines, points and control
- Least-squares adjustment principles explain residuals, weights and confidence estimates
- Record-driven editing preserves source-plan geometry and historic parcel states
- Splits, merges and boundary realignments processed through controlled transactions
- Adjustment results reviewed against survey control and legal evidence
- Change histories preserve predecessor parcels, dates and authorising documents
Participants can plan and control field evidence collection for parcel and asset updates.
- GNSS observations planned around control availability, obstruction and required accuracy
- Field collection forms enforce identifiers, photographs, dates and evidence categories
- Boundary evidence classified from monuments, occupation, plans and witness statements
- Offline maps support inspection where mobile connectivity is unavailable
- Collected observations synchronised, reviewed and assigned confidence categories
- Field-to-office workflow documents review, correction and approval responsibilities
Participants can assess imagery and elevation data as evidence for land and infrastructure records.
- Orthophoto resolution assessed against minimum mappable parcel and asset features
- Multispectral bands interpreted for vegetation, roofs, water and bare ground
- Image enhancement uses contrast stretching, band combinations and hillshades
- Ground control and orthorectification effects evaluated before boundary interpretation
- LiDAR derivatives reveal terrain, drainage corridors and built structures
- Remote-sensing evidence labelled by date, resolution and interpretation confidence
Participants can identify and investigate land-cover and built-environment changes from dated imagery.
- Object-based image interpretation identifies new buildings, roads and cleared land
- Supervised classification uses training samples, signatures and accuracy matrices
- Post-classification comparison isolates land-cover transitions between dated imagery
- Change candidates matched against permits, subdivisions and infrastructure work orders
- False positives screened using temporal evidence and field verification
- Exception maps direct inspection toward unrecorded development and encroachment
Participants can produce traceable parcel analyses for planning, service and investment decisions.
- Overlay analysis combines zoning, tenure, flood risk and service proximity
- Buffer distances model road reserves, utility corridors and protected areas
- Weighted linear combination ranks development sites using documented criteria
- Network analysis estimates access to roads, clinics and service depots
- Spatial joins quantify parcels affected by proposed infrastructure alignments
- Analysis assumptions recorded to prevent unsupported planning or compensation decisions
Participants can connect parcel information with maintainable infrastructure asset records.
- Asset registers aligned with GIS features, locations, identifiers and ownership
- Road centreline, drainage and utility schemas capture maintainable asset attributes
- Linear referencing locates pavement defects and pipe events by chainage
- Asset condition fields support inspection cycles, deterioration and maintenance priorities
- Parent-child relationships connect valves, pipes, chambers and service connections
- Infrastructure maps distinguish operational assets from planned and abandoned assets
Participants can map, analyse and communicate land interests affecting infrastructure works.
- Rights-of-way mapped using legal instruments, widths, restrictions and expiry dates
- Utility corridors analysed for crossings, conflicts, clearance and access constraints
- Permit applications checked against parcels, easements and protected infrastructure zones
- Encroachment cases documented with geometry, imagery, notices and resolution status
- Stakeholder notifications generated from affected parcels and contact relationships
- Conflict maps support route selection, compensation review and construction coordination
Participants can establish controlled storage, editing and recovery procedures for land information.
- Geodatabases organised with naming conventions, roles and controlled access
- Versioned editing separates proposed changes from approved authoritative records
- Check-in procedures reconcile concurrent edits and record conflict decisions
- Backup schedules, recovery tests and audit logs protect cadastral history
- ISO 19115 metadata captures purpose, lineage, constraints and distribution details
- Data-sharing agreements define permitted use, update duties and liability
Participants can publish controlled parcel information for operational users and stakeholders.
- OGC WMS, WFS and API patterns support controlled data exchange
- Web map layers configured with scale ranges, symbology and pop-ups
- Role-based access limits public, contractor and internal parcel views
- Print layouts produce survey review maps, notification plans and asset sheets
- Web forms collect correction requests with geometry, evidence and status
- Service performance monitored through availability, refresh frequency and user feedback
Participants can define governance roles, update rules and controls for parcel data stewardship.
- Data governance assigns owners, stewards, editors and quality approvers
- Business rules specify triggering events, evidence and authorised update pathways
- Service-level measures track update timeliness, completeness and error recurrence
- Personal data minimisation separates public parcel information from restricted records
- Retention schedules manage superseded plans, historical geometry and audit evidence
- Operating procedures define escalation for disputes and suspected data misuse
Participants can plan a phased parcel GIS implementation with testable requirements and controls.
- Requirements workshops translate stakeholder needs into measurable GIS acceptance criteria
- User stories describe parcel editing, asset inspection and public enquiry tasks
- Work breakdown structures estimate migration, configuration, testing and training effort
- Risk registers address legal disputes, source quality and integration dependencies
- Pilot releases test workflows before jurisdiction-wide production deployment
- Benefits measures link GIS outputs to processing time and data quality
Participants can communicate parcel evidence, uncertainty and operational priorities through clear GIS outputs.
- Cartographic hierarchy distinguishes legal boundaries, infrastructure assets and contextual reference data
- Symbology standards communicate tenure, restrictions, asset condition and confidence
- Map marginalia records scale, north arrow, coordinate system and source dates
- Decision briefings explain uncertainty, assumptions and alternatives without overstating evidence
- Dashboard indicators monitor edit backlogs, inspection coverage and unresolved conflicts
- Review sessions test map usability with operational and legal users
Participants can build, review and present a complete land parcel management and infrastructure GIS package.
- Capstone brief defines jurisdiction, business problem, evidence sources and acceptance criteria
- Parcel and infrastructure schema implemented with identifiers, domains and relationships
- Authoritative layers cleaned through topology validation, attribution checks and documented corrections
- Imagery or field evidence analysed to identify a defined change issue
- Spatial analysis produces affected-parcel, corridor or service-priority findings
- Web map, print map and quality report prepared for stakeholder review
- Peer review challenges assumptions, legal status, data quality and presentation decisions
Exercises and examples are adapted to each cohort's sectors and roles.








